A local content rule counts whatever its own text says it counts — the finished unit, named components, or value added inside the country — and different tenders define it differently. So “what counts” is never answered from general knowledge. It is answered by reading the tender’s counting rule line by line and assembling an evidence file that matches that definition.
Key Takeaways
- A local content rule counts what its own definition says — finished unit, components, or value added — and definitions differ per tender.
- Read the counting rule first and build the evidence file to that definition; confirm the buyer’s reading in writing.
- Assembly location alone settles nothing: the same factory can pass one definition and fail another.
- For funded programmes, confirm the domestic-content position against the current programme text before bidding.
Start With the Counting Rule, Not the Factory
Suppliers usually start at the wrong end: where the charger is made. The document starts with a definition. The same unit can pass one tender’s rule and fail another’s, because one counts the finished unit’s origin, another counts its components’ origin, and a third counts value added by local work. Until you know which definition applies, no supply-chain fact means anything.
| Question to ask of the document | Where the tender answers it | Evidence the supplier prepares |
|---|---|---|
| What exactly is counted — the finished unit, its components, or value added? | The definitions and eligibility sections | An origin file built to that definition |
| At what level is it measured — per unit, per model, or across the contract? | The eligibility clause and the submission forms | Declarations at the same level the rule measures |
| What evidence form is demanded — declaration, certificate, audit rights? | The submission requirements and contract terms | Signed declarations in the buyer’s format, supporting file behind them |
| When is it checked — at bid, at delivery, or both? | The evaluation section and the delivery clauses | The same file kept current through delivery |
| What follows if the count is missed? | The contract’s remedy and compliance clauses | Nothing — but read it before bidding; it prices the risk |

Assembly Is Not the Same as Content
The distinction that catches bidders out is assembly versus components. Local assembly of imported components may satisfy a rule written around value added, partly satisfy one written around components, and fail one written around the finished unit’s origin — three outcomes from the same factory. The mirror image also holds: local installation work is local by nature, but a rule that counts only the goods may give it no weight at all. None of this is settled by the words “made in” on a carton; it is settled by the counting definition — which is why experienced bidders quote the definition back in their clarification questions and get the buyer’s reading confirmed in writing.
Funded programmes carry the same lesson at national scale. U.S. federally funded charging projects work to the standards in 23 CFR Part 680, and any domestic-content condition attached to that funding is read from the current programme text — confirmed before a bid, as of October 2026, never assumed from a brochure. Our guide to EV charger certifications shows the same pattern: a claim is only as good as the file and the definition behind it.
Answering as an Import-Side Manufacturer
EVDANCE’s position is stated plainly, because tenders reward plain statements: it is a Shenzhen manufacturer, founded in 2011, with its own factory, exporting to more than 30 countries, with private label from 100 units and a 3-year standard warranty. For a tender whose counting rule an imported finished unit cannot meet, the honest move is not to bid that lot. For rules written around components or value, EVDANCE supplies the origin documentation behind its models so the bidder builds the count from documents, not assertions — and whose name sits on the supporting certificates matters, as our article on certificate ownership in private-label chargers explains. Content questions for a live tender start through the OEM and private-label program or contact us.

Frequently Asked Questions
Does local installation count as local content?
Only if the counting rule says so. Installation is local work, but a rule written around the goods may count none of it — if it is not named in the definition, do not build your count on it.
Does assembling imported chargers locally make them “local”?
Under a value-added rule, possibly in part; under a finished-unit origin rule, no. Assembly location is one fact in the file — the document’s definition decides what that fact proves.
Where do I check the position for a U.S. federally funded project?
In the current text of the programme rules — 23 CFR Part 680 on the eCFR, linked below — and in the funding agency’s documents for the specific project. Texts are amended, so confirm against the current version before the bid is priced.