Evdance
Select Language
English (US)
Deutsch
Français
Nederlands
Polski
Русский
한국어
ภาษาไทย
Tiếng Việt
Español
Português
العربية
Workplace & Fleet Solutions

Workplace EV Charging: Eight Hours Is All the Time You Need.

Employees park for a full working day, so slow AC charging is usually enough. The real questions are how many bays to equip, who pays and how to share bays fairly.

Who Charges at Work

Match Chargers to How People Park.

WhoTypical stayWhat a charger addsWhat fits
Office staff8–9 hUp to about 56 kWh on 7 kW AC, more than most daily commutes use7 kW AC; faster chargers add cost without benefit
Shift workers8–12 h, around the clockA full shift on 7–11 kW ACAC bays shared across shifts
Hybrid workers2–3 days a weekEnough for the week’s commutes on 7 kW ACShared bays with a booking system
Visitors and clients1–2 hAbout 60–120 km on 11 kW ACA few faster AC bays near reception
Company fleet and pool carsOvernight or between tripsA full charge overnight on ACAC overnight, a compact DC charger for quick turnarounds

Estimates assume about 18 kWh per 100 km.

Charging Speed

How Fast Do Workplace Chargers Need to Be?

Employees park for six to nine hours, so the goal is enough range for the trip home, not the fastest possible charge.

Short answer: an 11.5 kW Level 2 charger adds about 64 km (40 miles) of range per hour, and a 7.4 kW charger adds 100 km in about 2.4 hours. Over a full shift either one covers most commutes several times over, so sharing power across more bays with load balancing usually serves employees better than fewer, faster chargers.
Charging PowerRange Added per HourTime to Add 100 km (62 mi)Good Fit For
7.4 kW ACSingle-phase wallbox≈ 41 km / 25 mi≈ 2.4 hEmployee bays in Europe, the UK and Australia
9.6 kW Level 2North America, 40 A plug-in≈ 53 km / 33 mi≈ 1.9 hBays wired with NEMA 14-50 receptacles
11 kW ACThree-phase wallbox≈ 61 km / 38 mi≈ 1.6 hEmployee and fleet bays in Europe
11.5 kW Level 2North America, 48 A hardwired≈ 64 km / 40 mi≈ 1.6 hEmployee and fleet bays in North America
22 kW ACThree-phase wallbox≈ 122 km / 76 mi*≈ 49 min*Fleet vehicles that accept 22 kW AC

Estimates assume average consumption of 18 kWh per 100 km (about 3.5 miles per kWh), and do not include charging losses; real results vary with the vehicle, temperature and battery level. *AC charging speed is capped by the vehicle's onboard charger. Many EVs accept 11 kW AC at most, so a 22 kW AC charger gives those cars 11 kW. DC charging bypasses the onboard charger.

Fair Sharing

When There Are More EVs Than Bays.

Book or rotate bays

A simple booking or rotation rota stops the same early arrivals taking every charging bay.

Move-on reminders

App notifications when charging ends let colleagues swap cars during the day.

Socket wallboxes

Type 2 socket wallboxes let staff use their own cables, so a damaged cable is never left in the bay.

Give priority where it matters

Some workplaces prioritise staff with long commutes or no charging at home. Agree the rules before launch.

Plan for growth

EV numbers among staff rise every year. Lay ducting to extra bays during the first installation.

Keep visitor bays separate

A few faster bays near reception, kept free of staff cars, make a good impression on clients.

Who Pays

Free Perk or Paid Charging?

Free employee benefit

Simple and popular. Tax treatment of free workplace charging differs by country, so check local rules.

Employees pay per kWh

Staff pay through the app at a set price. Fair when only some staff drive EVs.

Fleet charging on the company

Fleet and pool cars are billed to the company with separate RFID cards, so costs stay apart from staff charging.

Usage reporting

Every session is logged in kWh, which helps with cost allocation and sustainability reporting.

Recommended Hardware

Chargers That Fit Workplaces.

Specifications from our current product catalogue. Certificates are listed per model in every quote.

Type 2 markets · single-phase

EV-ACT3204E wallbox

  • 7 kW, 32 A, 230 V single-phase
  • Tethered Type 2 cable, 5 m or 7 m
  • RFID card, app and plug-and-charge start
  • Wi-Fi and Bluetooth, 4G optional

Best for staff bays on a single-phase supply.

Type 2 markets · three-phase

EV-ACT1602PE wallbox

  • 11 kW, 16 A, 380–400 V three-phase
  • Tethered Type 2 cable, CEE 5-pin plug
  • RFID card, app and plug-and-charge start
  • Wi-Fi and Bluetooth, 4G optional

Best for staff bays on a three-phase supply.

Type 2 markets · socket outlet

EV-ACT3208PE socket wallbox

  • Up to 22 kW, 6–32 A, three-phase
  • Type 2 socket: drivers use their own cable
  • Over-current, over-temperature and control-pilot fault protection
  • IP56

Best for staff who bring their own cable.

DC · all markets

EV-RHDC30K-L compact DC charger

  • 22 kW DC output, single tethered connector
  • 380–415 V three-phase input
  • OCPP 1.6J, RFID card and app start
  • IP54, 5 m cable, floor-standing

Best for fleet and pool cars that turn around quickly.

North America

EV-ACT3204U / EV-ACT3204T

  • 32 A, 7.68 kW, 240 V
  • J1772 (U) or NACS (T), 25 ft cable
  • NEMA 14-50 plug
  • App and plug-and-charge start

Best for staff bays in the US and Canada.

North America

EV-ACT4001U / EV-ACT4001T

  • Up to 40 A, 9.6 kW, 208–240 V
  • J1772 (U) or NACS (T), 25 ft cable
  • NEMA 14-50 plug, needs a 50 A breaker
  • NEMA 4 / IP66, Wi-Fi and Bluetooth

Best for visitor and fleet bays in North America.

Final circuit sizing and permits must follow your local electrical code and be confirmed by a licensed electrician.

Market Requirements

Rules to Check Before You Install.

Private chargers for residents, employees or company vehicles face fewer payment rules than public ones, but safety, grid and smart-charging rules still apply. If members of the public can use them, public-charger payment rules apply too.

United States & Canada

  • Safety listing from a recognized testing lab (UL, ETL or CSA mark) for the exact model
  • Installation to NEC Article 625 in the US or the Canadian Electrical Code, usually under an electrical permit
  • Connectors: SAE J1772 or NACS (SAE J3400)
  • In California, renters and condo owners have a legal right to request a charger (Civil Code 1947.6 and 4745), subject to conditions

European Union

  • CE marking, with chargers built to IEC 61851
  • Connector: Type 2
  • In Germany, chargers up to 11 kW must be registered with the grid operator, and chargers above 11 kW need its approval before installation
  • The revised Energy Performance of Buildings Directive (EPBD) requires charging points and pre-cabling in new and majorly renovated buildings with car parks, as transposed by each country

United Kingdom

  • UKCA or CE marking
  • Connector: Type 2
  • Home and workplace chargers sold in Great Britain must meet the Electric Vehicles (Smart Charge Points) Regulations 2021, including smart functionality, default off-peak charging hours and a randomised start delay
  • Installation by a qualified electrician to BS 7671, with the local network operator notified
Buyer tip: ask every supplier, including us, for the certificate that covers the exact model, connector and voltage you are ordering, not just a logo in a brochure.
Charging Policy

Free Perk or Paid Benefit?

Workplace charging can be a benefit, a cost-recovery service or fleet infrastructure. Many companies combine all three.

Free Employee Perk

Best for: Attracting and retaining staff, and supporting sustainability goals.

How it works: Employees charge for free with RFID cards or the app, often with a session time limit.

Watch out for: Tax treatment. Some countries treat free workplace charging as a taxable benefit and others exempt it, so check local rules.

Cost Recovery

Best for: Larger sites where electricity costs add up.

How it works: Employees pay per kWh at or near cost through the app, with usage reports for HR or finance.

Watch out for: Keeping pricing simple and transparent so staff keep using the bays.

Fleet First

Best for: Companies running pool cars or service vehicles.

How it works: Fleet vehicles get priority access lists and overnight charging, and employees use the remaining bays by day.

Watch out for: Making sure fleet vehicles are plugged in before the end of each shift.

Faster Proposals

Send Us These 6 Details for a Tailored Plan.

This helps our engineers recommend the right configuration for your site faster.

1Country and city of the site
2Employees driving EVs today and in 2–3 years
3Parking bays available for charging
4Main electrical supply rating
5Number of company fleet vehicles
6Staff only, or visitors too
Send Your Workplace Details →
Common Questions

Workplace EV Charging — Frequently Asked Questions.

Is 7 kW enough for workplace charging?

For most staff, yes. A 7 kW charger delivers up to about 56 kWh over an eight-hour day, more than most daily commutes use. Faster chargers mainly help visitors and fleet vehicles.

How many chargers should we install?

Start with enough bays for current EV drivers plus some headroom, and lay ducting for more. Session data will show when bays are regularly full.

Should employees pay for charging?

Some companies offer it free as a benefit, others charge per kWh through the app. Check how free workplace charging is taxed in your country before deciding.

How do we share bays fairly?

Use a booking or rotation system, send app alerts when charging ends, and ask drivers to move their car once full.

Can visitors use the chargers?

Yes. Keep a few faster bays near reception for visitors and set their access and price separately from staff.

Can we report charging energy for sustainability goals?

Yes. Every session is logged in kWh by charger and by user, which you can export for cost allocation and carbon reporting.

Workplace Rollout

Equip Your Workplace For Fleet & Staff Growth.

Send us your staff numbers, current EV drivers and supply rating. We will suggest how many bays to start with and how to share them fairly.

Free
Campus Capacity Audit
Certified
Enterprise Hardware
Dedicated
Engineering Support
0