The chargers that suit Italy are sorted at your sites, not from a catalogue. Start with the supply each site actually has: older buildings in particular can have limited capacity, so have an electrician state each site’s supply in writing before any model is shortlisted. That figure sorts the range first — models with stated, adjustable current settings fit constrained sites — then phase build, connector family and nameplate window decide between the survivors. No grid figure for Italy is stated here; every supply number below is one your installer confirms, as of October 2026.
Key Takeaways
- Confirmed site supply capacity — older buildings first — sorts the range before any other check.
- Adjustable current is claimed only where a listing states it; for Type 2 variants the setting range is a written confirmation.
- Phase, connector family and nameplate window are per-site and per-parc confirmations, as of October 2026.
- The DC unit’s connector variant is not named in its listing — confirm it before planning a site around it.
The Five Checks, in Order
| Check | What you read | Who confirms it |
|---|---|---|
| 1. Confirmed supply capacity, older buildings first | The capacity the site’s supply can give a charger after existing loads | Your electrician, in writing, per site — never extrapolated from a newer building |
| 2. Stated current settings on the model | The current range or steps printed in the model’s listing; a silent line is an open question | The manufacturer, in writing, for the exact market variant ordered |
| 3. Phase build per site | Whether the site’s confirmed supply is single-phase or three-phase, and which models that admits | Your electrician, per site; our single-phase vs three-phase explainer covers the builds |
| 4. Connector family | The inlets of the vehicle parc your buyers serve | Your own parc survey — count inlets before fixing the family |
| 5. Nameplate window | The model’s stated voltage and current ratings, read against the confirmed supply from check 1 | You, against the electrician’s written figure — not against another market’s variant |
Reading the EVDANCE Range Against the Checks
In the EVDANCE range, the listings that state adjustable current are the EV-ACS4005T (16/24/32/40 A adjustable, 9.6 kW) and the EV-ACS3210T (10–32 A in six steps) — both North American NACS builds. For a Type 2 market variant, the setting range is a written confirmation for the exact model ordered; never carry a figure across from a sibling.
| Model | Stated facts |
|---|---|
| EV-ACS3210E | 32A Type 2 portable, single-phase about 7 kW, IP66 — the single-phase option; setting steps confirmed in writing, as above |
| ACS1605PE | 11 kW three-phase portable, CEE 5-pin, Type 2, 7.6 m, IP66 |
| EV-ACS3205PE | 22 kW three-phase portable, CEE 32A plug, Type 2, IP66 |
| EV-ACT3204PE | 22 kW wallbox, 3-phase, tethered Type 2 cable, RFID and app, IP66, CE |
| EV-AC03201T | Dual-connector AC station, up to 43 kW shared (22 kW per connector), OCPP 1.6J, RFID, IP54 |
| EV-RHDC30K-L | Compact DC charger, 22 kW DC, OCPP 1.6J, IP54 — connector variant not named in the listing; confirm in writing |

What Not to Assume
- That a newer building’s supply speaks for an older one. Capacity is per site; older stock is exactly where the written figure matters most.
- That a setting range travels between variants. A sibling model’s datasheet is not your model’s specification.
- That the DC unit’s connector is settled. The EV-RHDC30K-L listing names no connector variant; it is a written confirmation before any short-stay site is planned around it.

Ordering for Italian Sites
EVDANCE is a Shenzhen manufacturer founded in 2011, exports to more than 30 countries, offers private label from 100 units and backs its chargers with a 3-year standard warranty. Send your installers’ confirmed site figures with the enquiry. The full range is on the products page; importers and distributors can start via contact us.
Frequently Asked Questions
Are three-phase chargers the default choice for Italy?
There is no default. Phase is per-site: where your electrician confirms three-phase supply, the three-phase models open up; where the supply is single-phase, the EV-ACS3210E is the stated single-phase portable. Ordering the phase build before the site check reverses the table’s sequence.
My building’s supply is limited. What should I look for?
A model whose current settings are stated, so the charger can be set to what the site can give — and where the listing is silent, the setting range confirmed in writing for the exact variant. The electrician’s written figure comes first; the model follows it.
Which connector family should I stock?
The one your parc survey counts. Survey the inlets of the vehicles your buyers actually serve before fixing the family; a connector decision taken from another market’s parc is a stocking mistake paid for twice.
Related Reading
- Single-Phase vs Three-Phase EV Charging: 7kW, 11kW and 22kW Explained
- IP Ratings for EV Chargers: IP54, IP65 and IP66 Compared
- EV Charger Certifications Explained: CE, UKCA, UL, ETL, CB and What Buyers Should Ask For
- EV Charging News: Italy Adds a Record 6,311 Charging Points in Q2