Choosing Energy Meters for EV Chargers: MID, Accuracy Class and Billing

Billing decides the meter: when session energy is resold, specify an approved meter (MID in the EU system), the right accuracy class, and the certificate — in writing.

EVDANCE Insights · EV Charging Guides

Choose the meter by the job its readings will do. If session energy will only be shown to the driver, a basic internal meter is enough. If drivers, tenants or fleet customers will be billed per kilowatt-hour, the charger needs a meter approved for billing in that market — in the European system, an MID-approved meter — with an accuracy class matched to the job, and a certificate you can file.

Key Takeaways

  • Specify the meter for the job its readings will do — billing third parties sets the highest bar.
  • MID is the EU approval framework for billing meters; other markets run their own, so confirm locally.
  • Accuracy class is a stated, certified maximum error — get it in writing, matched to the job.
  • EVDANCE pages publish no meter approval or class — both are written-confirmation items on a billing order.

Start With the Job the Meter Has to Do

Every charger counts energy; the question is how much trust the number must carry. Three jobs come up in specifications:

Job for the readingsWhat the meter must be
Information only — session figures on a screen or in an appA functional internal meter; accuracy is a quality point only
Cost allocation inside one organisation — fleets, staff reimbursementA specified accuracy class and consistent records
Billing third parties per kWh — public charging, tenants, guestsA meter approved for billing use in that market, sealed as its approval requires

The middle row is where projects go wrong: a charger bought for information quietly becomes the billing source a year later. If billing is even a possibility, specify for it at purchase — retrofitting an approved meter rarely works. The home side is covered in our guide to smart meters for EV chargers.

EV-AC03201T dual-connector AC charging station
A dual-connector station: where both connectors bill by the session, the meter behind each record is a specification item.

What MID and Accuracy Class Actually Mean

MID is the European Union’s Measuring Instruments Directive — the framework under which a meter design is examined and approved for billing use; its certificate names the exact model covered. Other markets run their own routes, so an EU approval does not travel: confirm locally, as for any mark in our EV charger certifications guide.

Accuracy class states the maximum error under reference conditions, as a percentage of energy measured: class 1 means up to about one percent, class 2 up to about two. MID classes for active energy run A, B and C, broadly following the IEC ladder of 2, 1 and 0.5. Tighter is not automatically better — the class must satisfy your market’s billing rules. What matters is that it is stated and certified — not an adjective in a brochure.

The Specification Points That Decide Billing Fitness

  • Approval for the exact meter model. Ask for the certificate copy; check the model, the market covered and the conditions attached.
  • Accuracy class, in writing. One line in the quotation, naming the class — not an adjective.
  • Where the meter sits. Inside the charger, or a separate meter in the board? Both can work; approval and sealing differ.
  • Sealing and recalibration. Billing meters are sealed against adjustment. Ask who may break the seal, and how recalibration works.
  • The records produced. Start and end register readings per session, in a form billing can use — a disputed invoice stands on these records.
  • What the label shows. The meter’s markings should match its certificate; our guide to rating labels and required markings shows what to check on delivery.

Specifying Meters on an EVDANCE Order

Billing questions arise on site equipment such as the EV-AC03201T dual-connector AC station — two Type 2 connectors sharing up to 43 kW, OCPP 1.6J, RFID, session records to the operator’s platform — and the EV-ACT3204PE 22 kW wallbox, whose RFID and app keep per-session records. EVDANCE product pages publish no meter approval or accuracy class for these models, so both are written-confirmation items on any billing order: meter fitted, approval status for your market, class, certificate copy. Raise it through the OEM and private-label programme or contact us before ordering.

EVDANCE charging station installed at a site
On a shared site, charger session records are what itemised billing is built from.

Frequently Asked Questions

Is an MID meter required everywhere?

No. MID is the European framework; other markets approve billing meters through their own systems, and rules for reselling electricity by the kilowatt-hour differ again. Confirm with your market’s authority or certification body.

Does a tighter accuracy class change how the car charges?

No. The meter only measures; it does not control the session. A tighter class narrows the permitted error — it changes trust in the bill, not the charging.

Can the kWh figure in a charging app be billed from?

Only if the meter behind it is approved for billing in your market and the records meet local rules. An app display alone proves nothing — ask which meter produced the number.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post: