EV Charger Installation Certificate: What It Should Record

Wall-mounted EVDANCE home EV charger installed on a house exterior beside a driveway
An installation certificate attests one job: site, installer, unit serial, circuit, settings as left, date and signature. Here is the field set.

EVDANCE Insights · EV Charging Guides

An installation certificate is the installer’s signed attestation for one installation. It identifies the site, the installer, the charger’s serial number and the circuit that feeds it, states the scope of work done and the settings left in place, and closes with a date and a signature. It is not the test record and not the invoice — and where your jurisdiction prescribes an official form, that form, not any template, is the document that counts.

Key Takeaways

  • The certificate attests one installation: site, installer, unit serial, circuit, scope, settings, date, signature.
  • Record the charger’s setting and its breaker as a pair — 125% sizing makes them checkable together.
  • Where an official form is prescribed, it governs; this field set is the completeness check behind it.
  • Measured values belong to the test certificate, a separate document — neither replaces the other.
Wall-mounted EVDANCE home EV charger installed on a house wall
One certificate per installation: the document belongs to this unit, on this circuit, at this address.

The Field Set: What a Complete Certificate Records

Field groupWhat it recordsWhy it earns its place
Site identityInstallation address, customer name, date of completionTies the attestation to one property and one job
Installer identityCompany name, the individual who did the work, and any registration your jurisdiction’s scheme asks installers to holdAn unsigned, unattributed certificate answers nobody’s questions later
Unit identityCharger model and the serial number from its nameplate — not from the boxWarranty and manufacturer support start from the serial, as comparing charger warranties shows
Circuit identityWhich board and protective device feed the charger, and the breaker rating fittedThe next electrician should never have to guess which circuit is the charger’s
Scope attestationWhat was installed or altered: new circuit, board work, the charger itselfSeparates this job from earlier work at the same address
Settings as leftThe charger’s current setting and any limit applied when the installer leftThe setting is a decision someone made; the certificate is where it is written down
Sign-off and copiesDate, signature, and a note of who received a copyAttestation without a signature is a note, not a certificate

Settings as Left Deserve Their Own Lines

Most fields are identity. The settings block is the technical heart, because it pairs two numbers that must agree: the charger’s setting and the breaker behind it. Charging is a continuous load under the U.S. National Electrical Code, so the breaker is sized at 125% of charger current — 32 A on a 40 A breaker, 40 A on 50 A, 48 A on 60 A. Recording both sides of that pair is what makes the certificate checkable years later. Adjustable units make the line matter more: the EV-ACS4005T can be set at 16, 24, 32 or 40 A, so the certificate should state which setting was left, not the model’s maximum. The same discipline applies to the EV-ACT5006T, which runs up to 48 A hard-wired or on a NEMA 14-50P.

EVDANCE wall-mounted home EV charger with digital display
The nameplate gives the serial; the settings record gives the state the unit was left in. Both belong on the certificate.

What the Certificate Is Not

  • Not the test record. Measured values live in the test certificate — a separate document with its own field set. The installation certificate attests identity and scope; it does not carry readings.
  • Not the jurisdiction’s form, unless it is. Where an official form is prescribed, it governs. This field set is the completeness check behind whatever form you issue — confirm the current requirement with your local authority or inspection body.
  • Not transferable. The serial number binds it to one unit. Swap the charger and the new unit needs its own paperwork, as a standard installation’s documentation shows.
  • Not a performance promise. It attests what was installed and left working on the day — support after that day runs through the warranty route, not the certificate.

The installers who issue clean certificates share one habit: the document is completed on site, from the nameplate and the board, not reconstructed at the office. The background behind who may sign such work is covered in our guide to installer qualifications. Questions about supplying documented installations can start via contact us.

Frequently Asked Questions

Who keeps the original certificate?

Practice varies by jurisdiction and company. What matters is that both sides hold a copy: the customer’s joins the property’s electrical file, the installer’s is retained with the job record. Agree it at handover, not when a claim appears.

Is the installation certificate the same as the test certificate?

No. The installation certificate attests identity, scope and settings for one job. The test certificate records the measurements taken and the references they were judged against. Many jobs produce both; neither replaces the other.

The charger was replaced under warranty. Does the certificate change?

The original certificate describes the original unit. Record the replacement — its serial number, the date and who fitted it — as a new entry in the same file, so the property’s paperwork still tells one continuous story.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0