Concession Models in Public EV Charging: Who Pays, Who Earns

Row of EVs charging at commercial wall-mount charging stations in an office parking lot
Concession models differ in four answers: who funds the chargers, who owns them, who earns, and who carries the risk when sites stay quiet.

EVDANCE Insights · EV Charging Guides

In a public charging concession, a public owner grants an operator the right to build and run chargers on public land or in public car parks. Who pays for the hardware and installation, who owns the equipment, who sets the price drivers pay, and who carries the loss when a site stays quiet — those four answers change from one concession model to the next. The tender’s label tells you little; its money clauses tell you everything.

Key Takeaways

  • Four answers define a concession: who funds, who owns, who earns, and who carries the utilisation risk.
  • The same word “concession” covers owner-funded operation and fully operator-funded builds — only the documents say which.
  • Price control, inter-party payments and the end-of-term clause do most of the financial work.
  • A hardware supplier prices equipment, evidence and warranty — not the site’s revenue risk, unless its own contract says otherwise.
Commercial EV charging site with several ports
The site belongs to the public owner; almost everything else is negotiable structure.

Four Questions That Define Any Concession

Read a concession tender by finding the four answers below. Treat the table as a reading map, not as any real tender’s terms — those are always set by the tender’s own documents.

Model shapeWho funds hardware and installWho owns the equipmentWho earns the charging revenueWho carries utilisation risk
Owner-funded, operator-runThe public ownerThe public ownerSplit per the documents; the operator may simply be paid to run the networkMainly the owner; the operator risks its service fee, not the sites
Operator-funded concessionThe operatorThe operator during the termThe operator, after any fee owed to the ownerThe operator — quiet sites are its problem
Build, operate, transferThe operatorThe operator, passing to the owner at the end of the termThe operator during the termThe operator, including end-of-term asset condition
Grant-supported buildShared — a funding programme covers part, the operator funds the restPer the programme and contract termsThe operatorThe operator for its share; programme conditions (uptime, reporting, opening hours) bind the sites

How the Money Moves Inside Each Shape

Beyond the table, three clauses do most of the work. Price control: in some concessions the owner caps or approves the price per kWh, so the operator’s earning power is limited by the documents, not the market — how public prices are usually built is covered in how EV charging stations set prices. Payments between the parties: money may flow as a fee from operator to owner for the right to operate, as a service payment from owner to operator for keeping the network available, or both in different years of the term. End of term: the documents decide whether equipment is removed, bought by the owner, or handed over in a stated condition — a clause to read before choosing what to supply.

Reading a Concession Tender as a Hardware Supplier

A supplier’s slice of a concession is narrower than the concessionaire’s, and it should be priced that way. You sell equipment, evidence and warranty into the project; you do not take the site’s utilisation risk unless your own contract says so in writing. Two checks protect that boundary. First, whose name is on the performance promises: uptime and service duties belong to the party operating the network, so your supply terms should speak to hardware delivery, documentation and the 3-year standard warranty behind units such as the EV-AC03201T dual-connector AC station (two Type 2 connectors, up to 43 kW shared, OCPP 1.6J, RFID, IP54). Second, when the payment reaches you: in a concession chain you may be paid by the operator rather than the public owner, so the credit risk you are actually taking is the operator’s. Our commercial charging page outlines the range these projects draw from, and supplier conversations for tender projects run through the distributor programme or contact us.

EV charging installed in a parking garage
Public car parks are the classic concession site: public land, private operation, contract-defined money.

Frequently Asked Questions

Is a concession the same as a franchise?

No. A franchise is a private deal: a brand licenses its name and model to an operator, as our guide to charging station franchises explains. A concession starts with a public owner granting rights over public sites through a competitive tender; the public owner stays a party to the deal.

Does the public owner guarantee a minimum number of charging sessions?

Not by default. In operator-funded shapes the utilisation risk sits with the operator; if a particular tender offers any minimum-revenue or exclusivity protection, it will be written in the documents — and priced by every bidder who reads it. Assume nothing that is not written.

Who owns the chargers when the concession ends?

Whichever party the end-of-term clause names. In transfer shapes the equipment passes to the owner, with a condition standard attached; in others the operator removes it. Bidders should cost that clause at bid time, not discover it in the final year.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post: