Metering Compliance for Paid Charging: MID and Eichrecht

Billing drivers per kWh puts the charger's meter under metering law: MID in the EU framework, Eichrecht in Germany. What each demands is confirmed, not assumed.

EVDANCE Insights · EV Charging Guides

The moment a charging site sells energy by the kilowatt-hour, the number on the bill stops being a display figure and becomes a regulated measurement. Two names dominate that conversation in Europe: MID, the European Union’s Measuring Instruments Directive framework, and Eichrecht, Germany’s national calibration-law regime. They answer the same question — may this meter’s reading be used to bill a driver? — through different machinery, and neither regime’s requirements are a checklist to copy from an article: the seller confirms the position for its exact charger and billing design, in writing, before the first paid session.

Key Takeaways

  • Selling by the kWh makes the meter a regulated measurement — MID in the EU, Eichrecht in Germany.
  • The two regimes are separate confirmations; neither is discharged by the other.
  • The billing design — display, records, disputes — is part of the compliance position.
  • No EVDANCE listing states a metering approval; energy monitoring is not metering certification.
EVDANCE EV-AC03201T dual-connector AC charging station
A dual-connector station: the meter behind the bill is a compliance item.

Two Regimes, One Question

MID is the EU framework under which measuring instruments, including meters, are examined and approved for legally controlled uses such as billing. Approval under it attaches to the model examined — which is why the meter’s documents matter, as our guides to rating labels and required markings and EV charger certifications set out. Eichrecht is Germany’s calibration law: a national regime over the same billing question for charging sold in Germany, with its own approval and verification practice. One is a European framework; the other is one member state’s regime in depth. A seller active in Germany must satisfy itself on both — the second is not discharged by the first.

The Two Frameworks Side by Side

FrameworkWhat it governsWhose verification or approvalThe seller’s pre-launch confirmations
MID (EU)Whether a meter model’s measurement may be used for billing, under the EU frameworkThe conformity route the framework provides, evidenced by documents naming the exact meter modelThe fitted meter, its approval documents for the exact model, and their conditions
Eichrecht (Germany)Whether paid charging in Germany may bill on a meter’s reading, under German calibration lawThe German calibration side — the authority and bodies the regime works throughThe position for the exact charger and billing design, and the records to keep — in writing
Both togetherThe complete billing proposition: meter, charger, platform and driver recordEach regime’s route, closed separatelyNo paid launch until both files match the installed configuration

The Meter Is Only Half the Answer

Sellers routinely treat metering compliance as a hardware line — the approved meter — and stop there. The regimes reach further: what the driver is shown, how a session’s measurement is recorded, and how a disputed bill is reconstructed are part of the billing proposition being assessed. That is why the platform’s billing design is confirmed together with the charger, not after it. A display is not a meter: the touchscreen on a station such as the EV-AC03201T is a display, not a metering device and not a payment terminal, and a kWh figure on a screen is a display figure until the measurement behind it is approved for billing — the distinction our guide to smart meters for EV chargers draws from the buyer’s side.

The EVDANCE Position

Metering questions land on site equipment such as the EV-AC03201T dual-connector AC station (two Type 2 connectors, up to 43 kW shared, OCPP 1.6J, RFID, IP54) and the EV-ACT3204PE 22 kW wallbox (Type 2, RFID and app, IP66, CE). Metering questions land on site equipment such as the EV-AC03201T dual-connector AC station (two Type 2 connectors, up to 43 kW shared, OCPP 1.6J, RFID, IP54) and the EV-ACT3204PE 22 kW wallbox (Type 2, RFID and app, IP66, CE). No EVDANCE listing states MID approval, an Eichrecht position, or an approved billing meter for any model — and the EV-ACS3210E‘s “energy monitoring” is monitoring, not metering certification; the two phrases must never be blurred in a tender or sales document. For a paid-charging project, the exact model’s metering position is a written-confirmation item with EVDANCE, raised through the OEM and private-label programme or contact us, before the billing design is built on it.

EVDANCE EV-ACT3204E 22 kW Type 2 wallbox charger
The EV-ACT3204E: session records are not a metering approval.

Frequently Asked Questions

The charger displays kWh. Can we bill drivers from that figure?

Not on the strength of the display. Billing needs the measurement behind the figure approved for billing use under the regime that applies to your sale — MID, or Eichrecht in Germany — confirmed for the exact charger and billing design in writing.

Does MID approval settle Germany?

No. Germany runs its own calibration regime over the same question. Treat the two as separate confirmations: the EU framework position for the meter, and the German position for the complete paid-charging setup.

Can we bill per session or per minute instead, and skip metering law?

Which billing structures a market permits, and what each demands, is itself part of the same confirmation. Do not choose a structure as a workaround on an assumption — close it with the same authorities, in writing.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0