For a small number of chargers on an existing business site in England, planning permission is usually not needed: permitted development rights cover many modest installations at non-domestic premises, subject to conditions. The answer changes as the project grows — a public hub, prominent signage, a listed building or a new parking area can all need a full application. Treat this as a checklist of what to verify with your local planning authority, not a legal answer for your site.
Key Takeaways
- Small chargers on an existing business site in England often fall under permitted development, subject to conditions.
- Hubs, signage, canopies, listed buildings and new parking areas are where applications become likely.
- Planning is separate from building regulations, the grid connection, smart charging rules and landlord consent.
- Ask your council early with a site sketch, and keep the written reply with your project paperwork.
The Usual Case: Chargers on an Existing Site
Permitted development means the government has pre-approved a category of work, as long as its conditions are met. For workplaces and customer car parks, a few wall-mounted units or short posts inside an existing parking area are the simplest case: the land use is not changing and the equipment is small. The conditions are what matter — they concern the equipment’s size and position and its relationship to roads and boundaries, and they separate “no application needed” from “application needed after all”.
Do not assume the home rules carry over. Householders have a separate permitted development right written for homes; business premises are a different case.

When an Application Is More Likely
| Situation | Planning position, in general terms | What to check |
|---|---|---|
| A few chargers in an existing staff or customer car park | Often permitted development in England, subject to conditions | The size, position and visibility conditions on the right |
| A public charging hub with several fast chargers | More likely to need an application, and other approvals alongside | Your council’s planning team, early, with a site plan |
| Listed building or conservation area | Extra controls apply to anything that changes appearance | The council’s conservation advice before fixing positions |
| Canopies, lighting columns or advertising signage | Each addition can need its own consent, including advertisement consent | Whether the design can stay within simpler limits |
| Creating a new parking area, access or hardstanding | Development in its own right, beyond the chargers | A full application covering the whole scheme |
Planning Is Only One of the Consents
Four other approvals travel with a workplace installation:
- Electrical work and building regulations. The new circuits must be designed, installed and certified properly — your installer’s side, separate from planning.
- The grid connection. Larger installations, especially DC fast chargers, may need a new or upgraded supply agreed with the distribution network operator — often the longest step, so start early.
- Smart charging rules. The UK Smart Charge Points Regulations apply to workplace chargers as well as home ones, so specified units must meet the smart functionality and security requirements.
- Your landlord’s consent. If you lease the premises, the lease may require the landlord’s written agreement for alterations — a property matter, not a planning one.
Hardware choice interacts with all of this. A wallbox such as the EV-ACT3204PE 22 kW wallbox (three-phase, tethered Type 2 cable, RFID and app control, CE marked) covers most staff and fleet duties, while the EV-AC03201T dual-connector AC station shares up to 43 kW between two vehicles. Our commercial charging solutions set out the range; the business sequence is covered in how to open an EV charging station.

How to Check Before You Commit
- Send the council’s planning team a simple site sketch and equipment list, and ask whether the work is permitted development.
- Tell your installer at survey stage if the building is listed, in a conservation area, or close to a highway boundary.
- Open the grid conversation before ordering fast chargers — capacity, not permission, is usually the long pole.
- Keep the council’s reply and all certificates with the project paperwork for any future sale, lease or audit.
Frequently Asked Questions
Do the home planning rules apply to my business premises?
No. Homes have their own permitted development right with its own conditions. Business premises sit under a separate case, so a charger that needed no application at a director’s house may still need one at their office.
Does planning permission cover the electricity supply upgrade?
No. Planning deals with land use and appearance. The supply itself — capacity, a new connection, an upgraded cut-out — is agreed with your distribution network operator; your installer manages the certification side.
Is the position the same in Scotland, Wales and Northern Ireland?
Each nation runs its own permitted development rules, so the English position does not transfer. Check the equivalent national guidance and your council’s advice for sites outside England.
Related Reading
- How to Open an EV Charging Station: Step by Step
- Where to Install an EV Charging Station: Site Selection Guide
- How to Get an EV Charging Station License: Permits and Approvals
- Is EV Charger Installation VAT Free in the UK?