Evdance
Select Language
English (US)
Deutsch
Français
Nederlands
Polski
Русский
한국어
ภาษาไทย
Tiếng Việt
Español
Português
العربية

EV Charging News: Colorado Opens EV Home Charge Grants of Up to $350,000 for Co-ops and Municipal Utilities

The Colorado Energy Office opened its EV Home Charge round from October 13 to November 13, 2026, funding utility rebates for panel and wiring upgrades for home Level 2 charging.

EVDANCE Insights · Industry News

Colorado is targeting one of the biggest hidden costs of home charging: the electrical panel. The Colorado Energy Office opened a new application round for EV Home Charge on October 13, 2026, offering electric cooperatives and municipal utilities up to $350,000 each to fund customer rebates for panel and wiring upgrades for residential Level 2 chargers. Applications close at 5 p.m. MT on November 13, 2026.

Key Takeaways

  • Colorado opened an EV Home Charge round on October 13, 2026.
  • Co-ops and municipal utilities can receive up to $350,000.
  • Funds support rebates for panel and wiring upgrades for home Level 2 charging.
  • Applications close November 13, 2026.

Key Facts

  • Who can apply: Colorado electric co-ops and municipal utilities; investor-owned utilities are not eligible.
  • Amount: up to $350,000 per applicant.
  • What it funds: utility rebates for wiring and panel upgrades for Level 2 chargers at single-family homes, duplexes and townhomes.
  • Equity: awarded utilities may offer enhanced incentives for income-qualified customers.
  • Round dates: October 13 to November 13, 2026.

Why It Matters

The energy office says access to at-home charging is a barrier in Colorado, especially in older homes with insufficient panel space or long wiring runs. Funding the upgrade, rather than the charger alone, addresses the part of the job that often costs the most.

What It Means

A panel or wiring upgrade can cost more than the charger itself. Homeowners in participating utility areas should ask about rebates before booking an electrician, and installers should size circuits correctly: EV charging is a continuous load, so a 40 A charger needs a 50 A breaker and a 48 A charger a 60 A breaker under the NEC. Our EV-ACT5006T 48A Level 2 wall charger (ETL/FCC/CE) and EV-AC04001U 40A J1772 portable charger cover common Level 2 setups. See our residential charging range.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0