No public document describes a model-by-model EVDANCE factory test protocol, so the useful answer is not a claimed procedure — it is the set of checks a buyer can run. Four of them, in order: the documents for the exact model, a sample tested on your own supply, production units matched against that sample, and a pre-shipment inspection agreed in advance.
Key Takeaways
- No test protocol is published for these models — verify with evidence you hold, not adjectives.
- Run four checks: model documents, your own sample test, production-to-sample match, agreed pre-shipment inspection.
- Certification documents exist to request only where the model’s listing states the mark.
- The 3-year warranty is the in-service backing; its detail lives in the warranty document in your order file.
Why “Tested Before Shipping” Needs Evidence, Not Adjectives
Every charger factory says its units are tested. The statement costs nothing and proves nothing. What a buyer can rely on is evidence they hold: a test report naming the model, a sample they ran themselves, a delivered unit that matches the approved sample, and an inspection record made before shipment. A factory’s internal quality process is not published for these models; your protection is the paper trail your order creates. Our factory audit checklist for importers covers the wider audit of a supplier’s system; this article is the narrower, per-model version.
The Four Checks, in Order
| Check | What you ask for | What it proves |
|---|---|---|
| 1. Documents for the exact model | The test report and certificates behind the marks the model’s listing states | That this model, in this configuration, was tested against the standards its listing claims |
| 2. A sample, tested by you | A production-spec sample, run on your supply and your customers’ vehicles | Connector fit, the stated settings and behaviour, on your conditions — not the factory’s |
| 3. Production matched to the sample | Nameplate, markings and variant of delivered units compared with the approved sample | That the bulk order is the product you approved, not a near relation |
| 4. Pre-shipment inspection | An inspection agreed in the order, by your own inspector or a third party you appoint | The shipment’s condition, count and packing before it leaves |
Each check is a normal part of a written order between businesses, and each leaves you holding a record. Our guide to pre-shipment inspection and AQL sampling explains how to set the fourth one up.

Per-Model Honesty: Documents Follow the Listing
Certification documents exist to request only where a listing states a mark. The EV-ACT5006T states ETL, FCC and CE, so its file should hold the listing and test documents behind them — the kind of listing the OSHA NRTL programme oversees in the United States. The EV-ACS4005T states CE and FCC; the EV-ACT3204E states CE, with RoHS in its product description. For models whose listings state no mark, the correct request is different: ask what test documentation exists for that model, and file the answer with the order. A flagship’s certificate never covers a portable, and a range-level assurance is not a document. Our explainer on EV charger certifications sets out what each mark attests.
Ordering From EVDANCE
EVDANCE is a Shenzhen manufacturer founded in 2011, with its own factory, exports to more than 30 countries, and a private-label programme from 100 units — see the OEM and private-label programme and the reseller and distributor programme. Run the four checks as part of the order itself: documents requested with the quotation, the sample approved before production, the match rule written into the order, and the inspection agreed before the ship date. If a unit later fails in service, the standing backing is the standard 3-year warranty; what it covers in detail is set by the warranty document, which belongs in the same order file, read before the order, not after a failure. Questions about a specific model’s documentation start at contact us.

Frequently Asked Questions
Does EVDANCE test every unit, or only samples?
No public document says. That is why the question belongs in your order paperwork: ask in writing whether final-test records are kept per unit and how long they are retained, and file the answer. A claim you cannot check is not a check.
Can I inspect the goods before they ship?
Yes, as an arrangement agreed in the order — carried out by your own inspector or a third-party inspection firm you appoint. It is your arrangement to set up and pay for, which keeps its record independent.
What backs me if a unit fails in service?
The standard 3-year warranty is the stated term. Its coverage in detail — which parts, which process, which exclusions — is set by the warranty document, so obtain it with the order and keep it in the model’s file.
Related Reading
- EV Charger Factory Audit Checklist for Importers
- Pre-Shipment Inspection and AQL Sampling for EV Charger Orders
- EV Charger Certifications Explained: CE, UKCA, UL, ETL, CB and What Buyers Should Ask For
- OEM and Private-Label EV Chargers: A Complete Guide for Brands

