Commercial pedestal EV charging station charging a car outside an office building
A commercial handover is a document pack: installation certificate, test and commissioning records, as-builts, manuals, warranty terms and the platform transfer.

EVDANCE Insights · EV Charging Guides

A commercial charging project is handed over as a document pack, not a walk-round: the installation certificate and test records for the electrical work, as-built drawings of what was actually built, the manuals and warranty documents for the exact models fitted, the commissioning records, an asset register tying serial numbers to bays, and the platform accounts transferred into the owner’s name. Commissioning produces several of these items; handover is the step that assembles them against the contract’s list and puts both signatures on the same set.

Key Takeaways

  • Handover is a pack: certificate, test records, commissioning records, as-builts, manuals, warranty documents, asset register, platform transfer.
  • Each document answers a year-three question — who certified it, what was measured, what was built, what is covered.
  • Fix the pack’s contents in the contract; check it mechanically on the day; record gaps as open items, never as a complete receipt.
  • The manufacturer’s slice is exact-model: that model’s manual and that model’s warranty terms.
Commercial pedestal EV charging station charging a car outside an office building
The chargers are the visible handover. The pack behind them is the one the owner will still be using in year three.

The Pack, Document by Document

DocumentIssued byWhat it proves at year three
Installation certificate, on the jurisdiction’s own formThe licensed installer of recordThe installation was certified complete under the rules that governed it — the property’s primary evidence
Electrical test recordsThe licensed installerThe measured state of the circuits on the day of sign-off, behind the certificate
Commissioning recordsThe commissioning partyEvery unit and connector was exercised and left working, with settings as left
As-built drawingsThe contractor and design teamWhat was actually built — cable routes, board positions, bay layout — where the design and the site parted company
Manuals for the exact models fittedThe manufacturer, via the contractorOperation, care and fault guidance for these models is on site, not in a range brochure
Warranty documentsThe manufacturerThe terms, the start position and the claim route — for EVDANCE hardware, a 3-year standard warranty
Asset registerThe contractorSerial numbers matched to bays and boards: the index every other document refers to
Platform access transferThe platform provider, via the contractorThe owner — not the installer — controls the back office, the tariffs and the driver accounts

Assembled Against the Contract, Not From Memory

The time to fix the pack’s contents is the specification, not the handover meeting: the contract should name the documents, the format and who issues each one, the way a standard installation scope names the work itself. On the day, the check is mechanical — item by item against that list, with the site’s permit and approvals file (the subject of our guide to charging station permits and approvals) closed alongside it. Anything missing becomes an open item in the handover minutes, with an owner and a date. Signing a complete-pack receipt for an incomplete pack converts a contractor’s small delay into the owner’s permanent gap.

Close-up of a hand plugging an EVDANCE portable EV charger connector into a car
The register ties each serial number to its bay — the thread that connects certificates, records and claims.

The Manufacturer’s Slice of the Pack

Two pack items are the manufacturer’s to supply, and both are model-specific: the manual for the exact configuration fitted, and the warranty document behind it. For a station such as the EV-AC03201T dual-connector AC station (two Type 2 connectors, up to 43 kW shared, OCPP 1.6J, RFID, IP54), the pack carries that model’s documents — not the range catalogue — and EVDANCE’s standard warranty runs 3 years on its written terms. Wallboxes such as the EV-ACT3204PE (22 kW three-phase, RFID and app, IP66, CE) are filed the same way: exact model, exact variant. Contractors assembling packs for a project can request model documents through our commercial charging team or contact us, naming the model and the site.

Frequently Asked Questions

Who issues the installation certificate?

The licensed installer of record, on the form the project’s jurisdiction uses. There is no universal certificate and no universal form number — the document’s authority comes from the licensed signature and the rules it was issued under, which is why the pack keeps the test records behind it.

A document is missing on handover day. What do we do?

Record it as an open item in the handover minutes, with a named owner and a date, and let the contract’s own terms govern what follows — retention and payment consequences are contract matters. Do not sign a receipt describing the pack as complete; the minutes are the honest document.

Paper or digital — which pack counts?

Either, provided both sides hold the identical, complete set and it stays retrievable years later. Digital packs travel better between owner, operator and insurer; the asset register is what keeps the set indexed either way.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0