AFIR requires operators of publicly accessible chargers in the EU to accept ad hoc payment: any driver must be able to pay without a subscription or network membership, using payment instruments widely used in the Union. At higher-power charging stations that means a payment card reader or a contactless payment device at the station. At lower-power points, a secure internet payment route can be offered instead. In both cases, the full ad hoc price must be visible before the session starts.
Key Takeaways
- AFIR guarantees ad hoc payment at EU public chargers: no subscription or membership may be required.
- Higher-power stations need a card reader or contactless device; lower-power points may use secure internet payment.
- The full price, broken into components, must be known before the session starts.
- No EVDANCE model states a built-in card terminal — card acceptance is an operator-level item to confirm in writing.

Ad Hoc Payment, Station Class by Station Class
The duty falls on the operator, and the regulation draws its line by the power of the point. As of October 2026:
| Station class | What AFIR expects |
|---|---|
| Higher-power publicly accessible points | A payment card reader or contactless payment device must be installed at the station, so a driver can pay by bank card as they would for fuel. |
| Lower-power publicly accessible points | Ad hoc payment may run through a card reader, a contactless device, or a secure internet payment route such as a QR code flow. |
| All publicly accessible points | Payment must be genuinely ad hoc: no account, subscription or prior contract may be required to charge. |
The duties bite first on points deployed since April 2024; the regulation sets a later date by which higher-power points already in the ground must reach the same standard. Operators should read exact deadlines and thresholds in the regulation’s current text, not summaries — this article included. What ad hoc payment replaces is the closed model in which a driver first had to join the network running the station.
The Price-Transparency Half of the Rule
Payment is only half the chapter. AFIR pairs it with price duties designed to end the “plug in and find out” problem:
- Known before the session: the ad hoc price, with all its components, must be available before charging starts, so stations can be compared.
- Shown at the station: at higher-power points, the per-kilowatt-hour price and any per-minute occupancy fee must be displayed at the station.
- Components in the open: prices are broken into their components (energy, time, session, any other element), not bundled into one unexplained figure.
- Fair dealing through roaming: prices via mobility service providers must be reasonable, transparent and non-discriminatory, shown in advance, with no extra cross-border e-roaming charges.
National authorities monitor compliance, which is why price display is now a tender requirement on corridor projects. The US federal corridor programme moved in parallel: contactless payment without membership is a funding condition there.
What AFIR Does Not Do
Three limits are worth stating plainly. AFIR does not set or cap prices; operators keep their pricing freedom but lose the right to hide the price. It does not ban apps, RFID cards or subscriptions — those remain as extra routes; ad hoc payment is the guaranteed floor. And it does not make every charger a payment terminal by itself: the duty sits on the operator, who can meet it through station hardware, the backend platform, or both.
What This Means for EVDANCE Hardware on an EU Site
On EVDANCE stations the stated billing routes are backend ones: the EV-AC03201T dual-connector AC station (up to 43 kW shared, OCPP 1.6J, RFID) carries a 7-inch touchscreen, but that screen is a display, not a payment terminal, and no EVDANCE listing states a bank-card reader on any model, including the EV-RHDC30K-L compact DC charger (22 kW DC, OCPP 1.6J, IP54). On an EU public project, ad hoc card payment is therefore delivered by the operator’s payment hardware and platform working with the station over OCPP — a site-level item to confirm in writing, not a datasheet assumption. Our commercial charging team can confirm what a project configuration supports.

Frequently Asked Questions
Can an EU public charger still require an app?
It can offer an app but cannot require one: alongside any app route, the operator must provide ad hoc payment a driver with no account can use on the spot.
Do the payment rules apply to free charging?
The duties are written around paid public charging. A genuinely free point has no ad hoc price to display, though other rules, such as data provision, can still apply — check the current text for your case.
Does a QR code count as ad hoc payment?
At lower-power points, yes — a secure internet payment route can meet the duty. At higher-power points the regulation expects a card reader or contactless device at the station.
Related Reading
- OCPP Explained: What Charge Point Operators Need From EV Charger Hardware
- EV Charging Industry News: NEVI Funding Returns, the 30C Tax Credit Ends
- EV Charger Certifications Explained: CE, UKCA, UL, ETL, CB and What Buyers Should Ask For