The chargers that suit Turkey are decided site by site, by the supply confirmed at each site. An industrial unit, a logistics depot and a residential block do not present the same electrical picture: the confirmed service capacity and the phases available sort the range before the connector family is even discussed. So confirm capacity and phases per site class, match the nameplate window to what is confirmed, and only then fix connectors from the vehicles each site serves. As of October 2026, which configuration and market version Turkey requires is a written-confirmation item — nothing in this guide states a Turkish voltage, phase practice or plug type as fact.
Key Takeaways
- Sort by site class first: confirmed capacity and phases delete more of the catalogue than any connector question.
- Connector family follows the vehicles each site serves; enclosure rating follows the bay’s exposure.
- A charger’s rating is a ceiling — the confirmed site supply decides what a bay delivers.
- Turkey’s required configuration and each model’s market version, as of October 2026, are written-confirmation items.
Start With the Site’s Confirmed Supply
Capacity first, because it deletes more of the catalogue than any other question. A site whose confirmed service capacity is tight cannot host a high-power wallbox whatever its connector, and a site with three-phase capacity confirmed opens the 11 kW and 22 kW three-phase class. Get both figures — capacity and phases — from the site’s installer or supply authority, in writing, per site. How phase supply changes the charging on offer is set out in our explainer on single-phase vs three-phase charging, and our distributor guide to 11 kW vs 22 kW wallboxes covers the stocking consequence of the three-phase classes.
| Site class | Confirm first | The range it points to |
|---|---|---|
| Industrial unit or workshop | Service capacity and phases at the intake, confirmed by the site electrician | Three-phase wallboxes and stations where capacity is confirmed; portables for mobile work |
| Logistics depot | Capacity headroom against the site’s own loads, and dwell patterns by shift | Fleet wallboxes; a compact DC unit only where dwell is short and capacity allows |
| Office and retail parking | Phases at the distribution board and who pays for the energy | Access-controlled AC — RFID or app models, or a dual-connector station on a platform |
| Residential block | Per-dwelling capacity and the building’s shared-supply position | Single-phase portables and wallboxes; adjustable-current models where capacity is tight |

Then the Connector Family, From the Vehicles on Site
With the electrical picture fixed, the connector follows the vehicles each site serves: a contracted fleet is usually one family, while shared and public bays meet whatever the site’s users drive — which is why socketed units earn their place in shared parking. The stated enclosure rating is the last sort: match the IP rating on the listing to the bay’s exposure, covered or open, as our guide to IP ratings explains — dust-tight models for exposed yards, IP54 stations under cover.
EVDANCE Lines Against the Site Classes
Where three-phase capacity is confirmed, the three-phase Type 2 lines apply: the ACS1605PE portable (11 kW, CEE 5-pin, 7.6 m cable) and EV-ACS3205PE (22 kW, CEE 32A), the EV-ACT3204PE wallbox (22 kW, RFID and app, IP66, CE), and for shared bays the EV-AC03201T dual-connector station (up to 43 kW shared, OCPP 1.6J, RFID, IP54). Single-phase sites are served by the EV-ACS3210E portable (about 7 kW, Type 2, IP66). The EV-RHDC30K-L adds compact DC at 22 kW — below the 50–350 kW public fast-charging class — and its listing does not name the DC connector variant. Which market version of each line is offered for Turkey, and in what configuration, is confirmed in writing before ordering; site surveys go to the distributor program or contact us.

Frequently Asked Questions
Can one model cover every site class?
No. Capacity and phases differ by site, and a charger is limited by the supply it connects to. Stock by site class — the table above is the sort — rather than looking for a universal unit.
Is 22 kW charging available wherever I install?
Only where three-phase supply with the capacity to carry it is confirmed at that site. The rating on the charger is a ceiling, not a promise: the confirmed site supply decides what a bay actually delivers.
Which DC connector does the EV-RHDC30K-L use?
Its product page does not name the connector variant. Treat it as a written-confirmation item, closed against the vehicles your sites serve before any DC order is placed.
Related Reading
- Single-Phase vs Three-Phase EV Charging: 7kW, 11kW and 22kW Explained
- 11 kW vs 22 kW Wallbox: Which Should Distributors Stock for Europe?
- Portable EV Charger Types Explained: 10A, 16A, 32A and Three-Phase Models
- IP Ratings for EV Chargers: IP54, IP65 and IP66 Compared