Wall-mounted EVDANCE home EV charger installed on a house exterior beside a driveway
A job-site checklist for the EV-ACT5006T: confirm the version and the 60 A circuit before you arrive, then mount, test and hand over in order.

EVDANCE Insights · EV Charging Guides

A clean EV-ACT5006T install is decided by checks, not surprises: confirm which version was supplied (hardwired or NEMA 14-50P), confirm the circuit suits a 48 A continuous load — a 60 A breaker under the NEC 125% rule — and plan the mounting point around the 7.6 m cable. This checklist runs in job order: before you arrive, on site, at switch-on, and at handover.

Key Takeaways

  • Confirm the version (hardwired or 14-50P) and the 60 A circuit before the visit.
  • Plan the mounting point around the 7.6 m cable and the car’s real parking position.
  • Commission with a live test session on the customer’s car, and record the serial and breaker size for the job file.

Before You Arrive

  • Which version is on the van? The EV-ACT5006T comes hardwired or as a NEMA 14-50P plug-in. The two jobs differ — confirm against the order, not the box photo. Our comparison of hardwired vs plug-in chargers sets out what changes on site.
  • Circuit confirmed? At full output the charger draws 48 A as a continuous load, so the breaker is 60 A (48 A × 125%). If the panel cannot carry it, the job changes scope — see panel capacity explained and breaker sizing before the visit, not during it.
  • Mounting surface and position agreed? The cable is 7.6 m (25 ft). Agree the mounting point with the customer and check the cable reaches the car’s charge port with slack, in the car’s normal parking position.
  • Paperwork packed? Permit and inspection documents for the job, plus the unit’s manual for handover.
Wall-mounted EVDANCE home EV charger installed on a house exterior
Position is a checklist item, not an afterthought: the 7.6 m cable has to reach the charge port with slack.

On Site

CheckWhat “good” looks like
Mounting surfaceSolid fixing into structure, unit level, rating label readable after mounting
ExposureUnit is IP65/IP66, but keep direct hose-down and standing water out of the plan; connector holstered off the ground
Cable runNo sharp edges, no strain on the connector, cable not trapped by doors or driven over by design
Version-specificHardwired: connections made per the manual and local code. Plug-in: the 14-50 outlet is sound, correctly oriented and not warm-running (replace a worn outlet rather than plug into it)
ClearancesCustomer can reach the connector, read the unit’s indicators and park without the cable crossing a walkway under tension

At Switch-On

  • Power up and confirm the unit’s indicators show ready, with no fault state.
  • Run a real test session with the customer’s car, not just a power-on check: session starts cleanly, charging proceeds at Level 2 rate.
  • Stop and restart the session once, the way the customer will, and confirm the connector latches and releases normally.
  • If anything fails, note the indicator state before resetting — it is the first thing support will ask for.
EV-ACT5006T 48 A NACS Level 2 wall charger
The EV-ACT5006T: test with the customer’s car, not just at the breaker.

Handover

  • Show the customer how to start and stop a session and where the indicators are.
  • Leave the manual, and note the warranty: EVDANCE units carry a 3-year standard warranty.
  • Photograph the rating label and record the model, serial number and breaker size in the job file — the next visit, or a warranty claim, starts from these.
  • Record the fitted version (hardwired or plug-in) and the final mounting position on the job sheet.

Installer programs and product supply run through the EV-ACT5006T product page and the residential charging page. Installation work itself should always be done or signed off by a licensed electrician following local code.

Frequently Asked Questions

What size breaker does the EV-ACT5006T need at full output?

60 A. EV charging is a continuous load under the NEC, so the breaker is 125% of the 48 A draw. Lower settings, where used, follow the same 125% rule.

How do I know which version I am installing?

Check the order and the unit before the visit: the plug-in version has a NEMA 14-50P plug; the hardwired version does not. The checks in this list differ between the two.

How far can the car be from the charger?

The cable is 7.6 m (25 ft). Plan the mounting position so it reaches the charge port in the car’s normal parking position, with slack — not pulled tight.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide