Placing a floor-standing charging station so every driver can use it is a set of design decisions, not a dimension copied from a chart. The operator and the site designer work through position, approach space, reach to both connectors and the screen, and how the cable handles — then the site’s binding requirements are confirmed with the local authority or accessibility adviser. This article lists the decisions and questions; it states no standard, because none applies everywhere.
Key Takeaways
- Accessible placement is a decision process, not a set of universal dimensions.
- Confirm the site’s binding requirements with the local authority or adviser, in writing.
- Two connectors from one position make reach and cable routing a layout question to settle before installation.
- Confirm the cable length in writing — the listing does not state one.
Start With Decisions, Not Dimensions
Accessibility rules for charging bays are set locally, and they differ between countries, states, and even funding programmes. A measurement that satisfies one authority may fail another, so quoting numbers here would mislead more than it helps. What transfers is the decision process: walk the driver’s whole journey — arrive, park, reach the station, start, handle the cable, finish, leave — and check each step with the designer before anything is poured. A general site selection guide covers choosing the location; this article covers placement once it is chosen.

The Placement Decisions
| Decision | What to work through | Who confirms it |
|---|---|---|
| Position between bays | Centred so both connectors serve their bays, without the station narrowing anyone’s door swing or transfer space | Site designer |
| Approach space | A clear, level route from the parked car to the station face, kept free of kerbs and stored items | Designer, against local requirements |
| Reach to connectors and screen | Both connector holsters and the 7-inch touchscreen usable by a driver who stays seated — test with a real user, do not assume | Designer and adviser |
| Cable handling | Cable length and weight are part of usability; the listing states no cable length for this station, so confirm it in writing before the layout relies on it | Supplier, in writing |
| Surface and drainage | Firm, slip-resistant ground at the station that does not pond water where a driver stands or wheels | Site contractor |
| Marking and signage | Bay markings and signs that a driver can read on arrival, day and night, as part of the site’s own design | Site operator |
Two Connectors Change the Layout Question
A dual-connector floor station such as the EV-AC03201T serves two bays from one position, which creates a choice a single wallbox never raises. It can stand between the bays, at the head of both, or offset toward one side — each choice changes which connector is easier to reach from which bay. If one bay is meant for drivers who need the most space, the question is which connector serves it with the shorter, clearer approach, and whether the other car’s cable crosses that space. Settle it on the drawing, with the designer, before installation. How a dual port charger splits its work explains the hardware side.

Questions to Settle Before the Foundation Is Poured
- Which local requirements apply to this site, and who has confirmed them in writing?
- From the bay that needs the most space, can a seated driver reach a connector, the screen, and the RFID reader without crossing the other car’s cable?
- Is the cable long enough — confirmed in writing — for the far bay in the chosen layout?
- Does the approach stay clear and level in rain, and is the station lit well enough at night?
The Station in This Example
The EV-AC03201T is a floor-standing AC station with two Type 2 connectors sharing up to 43 kW (22 kW per connector, dynamically distributed), a 7-inch touchscreen, RFID access, OCPP 1.6J, and an IP54 enclosure. Its floor-standing form makes placement a one-time decision. EVDANCE’s commercial charging solutions cover the wider site picture.
Frequently Asked Questions
Are there standard dimensions I can design an accessible charging bay to?
Requirements are set locally and vary, so this article gives none. Ask the local authority or an accessibility adviser which rules apply to your site, get the answer in writing, and design to that — a figure copied from another country’s guidance can fail your inspection.
Can one dual-connector station serve an accessible bay and a standard bay?
That is a layout decision for the site designer. The two-connector layout raises the questions listed above — approach, reach, cable crossing — and the designer settles them against the local requirements for the specific site.
Does the station’s IP54 rating matter for accessibility?
Not directly. IP54 describes dust and water protection for the enclosure. It affects where the station can stand outdoors, but whether drivers can reach and use it is decided by placement, not by the rating.
Related Reading
- Where to Install an EV Charging Station: Site Selection Guide
- What Is a Dual Port EV Charger? How It Works and How to Choose
- How Do Commercial EV Charging Stations Work?

