A grant application is scored on evidence, not on the charger alone. Funders ask for the same block of specifications — rated power, connector type, networking, access and payment arrangements, siting, and the uptime you commit to — and every answer has to match documents you can file. The EV-AC03201T answers most of that block straight from its published specification: 43 kW shared across two Type 2 connectors, OCPP 1.6J networking, RFID access. The lines it does not answer become written confirmations, obtained before the deadline. Eligibility, funding percentages and deadlines are each funder’s own current terms; this article covers the spec side of the form.
Key Takeaways
- Funders grade the evidence pack: power, connectors, networking, access and siting are answered from the stated spec.
- Platform pairing, certificates and payment hardware are written confirmations — the listing does not state them.
- Uptime on a form is the operator’s commitment, not a product figure; this station publishes none.
- Terms, percentages and deadlines are the funder’s current rules — confirm them with the funder, not the brochure.

The Spec Block Every Form Starts With
| Funder’s line | What it checks | This station’s stated answer |
|---|---|---|
| Rated power | Total output and output per connector | 43 kW shared; 22 kW per connector |
| Connectors | Type and count | Two Type 2 connectors |
| Form and enclosure | Mounting type and outdoor rating | Floor-standing; IP54 |
| Networking | The protocol the back office speaks | OCPP 1.6J |
| Access | How drivers are identified | RFID |
These lines copy straight from the spec sheet, which itself belongs in the evidence pack. Problems start where forms ask questions the sheet does not answer.
Lines That Need a Written Answer, Not an Assumption
- Named platform pairing. OCPP 1.6J states the protocol. That this station has been tested with the platform your funder names is a compatibility confirmation — get it in writing; the listing names no platform.
- Payment hardware. The listing states no built-in payment terminal, and the 7-inch touchscreen is a driver interface, not a card reader. If the form asks how drivers pay, describe your platform arrangement — app, account or RFID — exactly as it will run.
- Certificates. The listing names no certification marks for this station. Where a funder requires certificates or test reports, request the document set in writing and file what you receive; never borrow a mark from a different model.
- Uptime. This station publishes no uptime percentage, so there is no product figure to enter: the line is your commitment, backed by a maintenance and response plan — promise only what your operation can hold.
The Evidence Pack Behind the Form
- The spec sheet for the exact model named in the application.
- The written confirmations gathered above — platform pairing, and the certificate set on request.
- The site plan and the supply confirmation from your installer or network operator.
- After installation: commissioning records for both connectors and the platform connection, plus the maintenance plan — keep every version together.
One US note: business applicants sometimes meet the federal Section 30C credit instead of a grant. As published, its terms covered property placed in service from January 1, 2023 to June 30, 2026 — 6%, or 30% with wage and apprenticeship requirements, up to $100,000 per item — a window that has now closed: a tax adviser’s subject, not a form line. For programmes that are live, DSIRE tracks current incentives.

The Station Behind the Application
The EV-AC03201T is EVDANCE’s dual-connector AC station: two Type 2 connectors, up to 43 kW shared (22 kW per connector), dynamic power allocation, OCPP 1.6J, RFID and an IP54 floor-standing enclosure.
EVDANCE is a Shenzhen manufacturer founded in 2011, exporting to 30+ countries; document requests go through the contact page, and the wider range is on the commercial charging page.
Frequently Asked Questions
Can I state the station’s certifications on the form?
Only what you hold documents for. The listing names no certification marks for this model, so request the set in writing before completing that line — a mark copied from another model is a checkable misstatement.
Does OCPP 1.6J satisfy a networking requirement?
It answers the protocol line, which is what most forms ask first. If your funder names a platform, a tested pairing or a protocol certification, treat that as a separate written confirmation — never infer it from the version number.
The form asks for expected uptime. What do I enter?
Your own operational commitment, backed by your maintenance plan. Programmes set their own bars — the US NEVI rules require corridor DC stations to average above 97% annual uptime — but that is a programme requirement, not this station’s figure. Commit only to what your response arrangements can deliver.
Related Reading
- How Do I Claim My EV Charger Grant? UK, Ireland and US Explained
- Is the EV Charger Grant Ending? UK, US and Ireland Status in 2026
- OCPP Explained: What Charge Point Operators Need From EV Charger Hardware
- How Much Does It Cost to Install a Commercial EV Charging Station?