Most DC charger grant paperwork is not the form — it is the document pack behind it. Prepare three things before you apply: the charger’s stated specifications, written confirmations for every line the product listing leaves blank, and your own site evidence — photos, a supply assessment, an installation quote. For the EV-RHDC30K-L the stated lines are a 22 kW rating, a single connector, OCPP 1.6J and an IP54 enclosure; its connector type and certificates have to be requested, not copied. What each programme then requires is set by that programme’s own current guidance — this article covers the pack, not the rules.
Key Takeaways
- The pack comes before the form: charger documents, written confirmations, site evidence.
- File 22 kW everywhere; the model name’s “30K” is not a rating.
- The connector standard and certificates are written confirmations — the listing does not state them.
- Class fit is set by each programme’s own rules: NEVI corridor funding starts at 150 kW per DC port.

Three Folders to Assemble Before Any Form
| Folder | What goes in it | Where it comes from |
|---|---|---|
| Charger documents | The spec sheet for the exact model named in the application | The manufacturer’s documentation |
| Written confirmations | The fitted connector standard; the certificate and test-report set; any named platform pairing | Requested from the manufacturer in writing — see the traps below |
| Site evidence | Photos of the proposed position, the supply assessment, the installation quote and the site plan | Your own project file, gathered before the deadline |
| Post-installation records | Commissioning records and the platform connection check, kept with the pack | Produced at installation, in case the programme asks afterwards |
The pack also exposes gaps while there is time to close them. Two are specific to this charger, and both come from copying.
Two Traps Specific to This Charger
- The model name is not a rating. The name carries “30K”, but the product page rates the unit at 22 kW. File 22 kW, use it consistently in every field, and keep the datasheet in the pack so the figure can be checked. A power field copied from the model name is a checkable misstatement.
- The connector line is blank. The listing does not name the DC connector standard fitted, and grant forms ask for it. Get the fitted connector in writing before the deadline and file the confirmation. Never copy a connector type from another charger’s sheet.
Check the Programme Fits This Charger Class
A complete pack cannot fix a class mismatch, so check the fit before you write anything. Programmes define their own eligible hardware. The US NEVI corridor rules, for example, require DC ports of at least 150 kW, open 24/7, with contactless payment and average annual uptime above 97%. A 22 kW compact unit is not a corridor charger — do not file it under a programme written for one.
Destination, workplace and fleet programmes are the natural reading list for a unit of this class; DSIRE tracks current US incentives. One US tax note: the federal Section 30C credit’s published terms covered property placed in service from January 1, 2023 to June 30, 2026, so that window has closed; whether anything applies to your project is a question for a tax adviser, not a form line. Our guide to claiming an EV charger grant covers the claim process itself.
The Charger Behind the Paperwork
The EV-RHDC30K-L is a floor-standing, single-connector DC charger: rated 22 kW on its product page, with an LCD, OCPP 1.6J networking and an IP54 enclosure. EVDANCE is a Shenzhen manufacturer founded in 2011, and its chargers carry a 3-year standard warranty. Document requests go through the contact page; the wider range is on the commercial charging page.

Frequently Asked Questions
Which power figure goes on the form — 22 kW or 30 kW?
22 kW — the product page’s rating, used consistently, with the datasheet filed in the pack. The “30K” is part of the model name, not a rating. Never file a figure you cannot document.
The form asks for the connector type, but the listing does not state one. What do I do?
Request the fitted connector standard from the manufacturer in writing and file the confirmation with the form. Do not copy a connector from a different model, and do not assume one — the answer has to match the unit that will be installed.
Can this charger be funded under the NEVI programme?
NEVI corridor rules require DC ports of at least 150 kW, so this 22 kW unit does not meet that line. Look at programmes aimed at destination, workplace or fleet charging instead, and read their current guidance — eligibility is the programme’s call, not the manufacturer’s.
Related Reading
- How Do I Claim My EV Charger Grant? UK, Ireland and US Explained
- Is the EV Charger Grant Ending? UK, US and Ireland Status in 2026
- OCPP Explained: What Charge Point Operators Need From EV Charger Hardware
- How Much Does It Cost to Install a Commercial EV Charging Station?