A sports club sets up EV charging the same way any small site host does, at club scale: agree who the charging is for, have an electrician check what the clubhouse supply can spare, get the permissions your lease requires, and install AC posts sized to how long cars sit — a training session or a match. The sequence below follows the general route in our guide to opening an EV charging station, translated for a volunteer-run club with one car park.
Key Takeaways
- Settle the audience first — members only, or visitors too — because it decides access and payment.
- The clubhouse supply is checked by an electrician; floodlight evenings are part of the load.
- Permissions come from your lease and local authority, in writing, before hardware is ordered.
- Training and match dwell suit AC charging; one dual-connector post serves two bays.
Step 1: Decide Who the Charging Is For
A club has three audiences, and the answer shapes everything after it:
- Members — the core case: regulars who park for training and matches, several times a week.
- Visiting teams and spectators — occasional users who need a simple way to start a session and pay.
- Staff and coaches — the longest dwell on site, often all day.
A members-only setup can stay simple; opening the posts to visitors adds payment and access questions. Settle the audience in committee before anyone prices hardware.
Step 2: Check the Power You Already Have
Most clubs will charge from the clubhouse supply, and its spare capacity is a measured fact, not a guess. A licensed electrician checks the supply, the board and the times the building itself peaks — floodlights and a clubhouse kitchen on a match evening are the club’s own load, on the same service. If the supply is tight, modest per-post power usually still fits; if an upgrade is needed, its cost and timing come from the utility’s written answer.

Step 3: Permissions, in Writing
Clubs often occupy land they do not own. Before ordering anything, confirm in writing: the landowner or landlord’s consent (many grounds are leased from a council or trust), any planning or signage conditions your local authority applies, and who insures the installation. These are local confirmations that vary by area and lease — no guide can settle them for your ground.
Step 4: Match the Hardware to How Long Cars Sit
| Visit pattern | Typical dwell | What fits |
|---|---|---|
| Training session | About 1–2 hours | AC destination charging — a useful top-up inside one session |
| Match day | Half a day for players and officials | AC charging; more energy per visit at the same posts |
| Staff and coaches | All day | The same AC posts, outside the member peak |
Club dwell is measured in hours, so AC is the right class — the U.S. DOT puts Level 2 at 7–19 kW, plenty inside a match-length park. The EV-AC03201T dual-connector station charges two cars side by side at up to 22 kW per connector (43 kW shared), with RFID access and OCPP 1.6J — one post covers two bays, and member cards identify who is charging. For Type 2 markets, the EV-ACT3204PE 22 kW wallbox adds RFID and app access on the clubhouse wall. Site choice follows the same logic as our site selection guide: posts near the entrance get used; posts at the far fence do not.
Step 5: Access, Payment and Launch
Members charge on RFID cards, which the station states as a feature; visitors charge through your platform arrangement, since no built-in payment terminal is stated for the unit — do not promise tap-and-pay at the post unless your platform provides it another way. Pricing is club policy: free for members, paid for visitors, or bundled into membership, and RFID user management keeps the two groups separate in the records. Launch with the unglamorous items done: bays marked and signed, posts lit after dark, a named fault contact, and the installation documents filed where the next committee can find them.

Frequently Asked Questions
What does a small club installation cost?
There is no club-specific figure. The sourced frame is the DOE’s public Level 2 benchmark — about $3,500 equipment plus $2,500 installation per connector in the U.S. Your real number comes from installers’ quotes for your ground, especially if the supply needs work.
Do we need planning permission?
It depends on your area, your land and how the posts are mounted — which is why step 3 is a written confirmation from your local authority and landowner, not an assumption. Ask before the installation is designed, not after.
Can visiting teams use the chargers?
Yes, if the club designs for it: visitors need a way to start and pay without a member card, which runs through your platform arrangement. Skip that decision and the posts end up members-only by default.
Related Reading
- How to Open an EV Charging Station: Step by Step
- Where to Install an EV Charging Station: Site Selection Guide
- RFID and User Management for Shared EV Chargers