A business cannot apply to the federal NEVI programme directly. NEVI — the National Electric Vehicle Infrastructure programme — is a formula programme: federal funds flow to states under state plans, and states then run their own solicitations in which developers, operators and site hosts take part. So “who can apply” has two answers at two levels: the state applies for the money; your project applies to the state.
Key Takeaways
- NEVI money is applied for by states under state plans — there is no direct federal application for a site.
- Businesses, hosts and operators take part through their state’s own solicitation, on the state’s current documents.
- The federal conditions (150 kW ports, CCS1, 24/7, contactless, above 97% uptime) flow down into every award.
- Off-corridor sites belong to state, utility and local programmes — a different door, found via DSIRE.

The Two Doors Into NEVI
| Level | Who applies | To whom | For what |
|---|---|---|---|
| Federal | The state (its transport department) | The federal programme, under its state plan | The state’s NEVI funding, to be spent on corridor fast charging |
| State | Site developers, charging operators, site hosts in partnership | The state’s own NEVI solicitation or procurement | A funded project at a specific station site |
Everything a private applicant touches — eligibility, site lists, deadlines, match terms, scoring — is set by the state’s current programme documents for the round in question. There is no federal application form for a charging site, and any summary, including this one, is a map of the route, not a substitute for your state’s documents.
What the State Door Looks Like
States publish their NEVI plans and run solicitations for station sites along designated corridors. A site-side application is judged as a project, not as a product purchase: where the station goes, who builds and operates it, and whether the finished station can carry the federal conditions attached to the money. Those conditions — DC ports of at least 150 kW with CCS1 connectors, opening 24/7, contactless payment with no membership required, and average annual uptime above 97% — are set in 23 CFR Part 680 and flow down into every state award.
What a Site-Side Applicant Must Be Ready to Show
- A site the corridor programme can use, with the property owner’s agreement to install and operate the station for the programme’s term.
- A utility position: early coordination with the local utility on capacity and connection terms — the same step that leads any charging station licence and permits process.
- Hardware that meets the federal floor on power, connector and payment, with the evidence file a funded project is audited against.
- An operating commitment, because 24/7 access and above-97% uptime are duties over years, not installation-day features.

If Your Site Is Not on a Corridor
NEVI is corridor money. Sites away from designated corridors are served by other funding: state, utility and local programmes with their own rules, which the DSIRE database tracks by state. Tax credits are a separate channel again — they are claimed on a tax return, not applied for, and the federal 30C credit is closed for property placed in service after June 30, 2026. Our guide to claiming an EV charger grant sets out how the channels differ.
Hardware Conversations Start With the Requirements
Honesty about hardware saves applications. EVDANCE’s DC unit, the EV-RHDC30K-L, delivers 22 kW DC — well below the 150 kW NEVI port floor, so it is not corridor hardware and we do not present it as any. It and the EV-AC03201T dual-connector AC station serve the non-corridor projects — depots, workplaces, destinations — whose funding documents set their own terms. Start from the requirements your funding route imposes, then talk hardware via contact us or the commercial charging page.
Frequently Asked Questions
Can a gas station or travel plaza apply for NEVI funds?
Not to the federal programme directly. A corridor site takes part through its state’s solicitation when a round is open — typically as the host, partnering with the developer or operator who carries the application and the operating duties.
Can a city or county apply?
The applicant of record for NEVI funds is the state. Local bodies and public agencies participate through the state’s plan and solicitations, on the terms the state publishes — check your state transport department’s NEVI pages for the current round.
Where do I find my state’s current round?
On your state transport department’s NEVI pages, and via the DSIRE database of incentives. Rounds open, close and change; work only from the current documents, never from a previous round’s summary.
Related Reading
- How to Get an EV Charging Station License: Permits and Approvals
- How Do I Claim My EV Charger Grant? UK, Ireland and US Explained
- How Much Does It Cost to Install a Commercial EV Charging Station?