There is usually no single license. You need permits, utility approval and, if you sell by the kWh, weights and measures compliance. Rules vary by state.

EVDANCE Insights · EV Charging Guides

In the US, there is usually no single “EV charging station license.” Instead, you need a set of approvals: a registered business, zoning and electrical permits from your city or county, a utility service application, and, in many states, weights and measures registration or inspection for chargers that sell energy by the kWh. The exact list varies by state and city, so start with your local permitting office and your electric utility.

The Approvals Most Sites Need

ApprovalWho issues itWhat it covers
Business registration and tax IDState and local governmentLegal entity, sales tax on charging where it applies
Zoning or site plan approvalCity or county planningLand use, parking layout, signage, accessibility
Electrical and building permitsLocal building departmentWiring, foundations, inspections under the adopted electrical code
Utility service or upgradeElectric utilityNew service, transformer, metering, rate plan
Weights and measuresState or local weights and measures officeAccurate kWh metering and price display
Funding program approvalState DOT or grant agencyExtra rules if you accept NEVI or other public funds

Permits and the Utility

Your electrical contractor normally pulls the electrical permit, and the work is inspected against the electrical code your area has adopted, usually a version of the NEC. Commercial sites often need stamped drawings, a load calculation and a site plan. See where to install an EV charging station for site selection basics.

Contact your utility early. DC fast chargers may need a new service or transformer, and lead times can be long. Ask about commercial rate plans, demand charges and any make-ready programs that cover part of the wiring cost. Some states have addressed whether selling EV charging makes a site host a regulated utility. If you are unsure, ask your state public utility commission.

Weights and Measures: Selling Energy by the kWh

If you charge drivers based on energy delivered, the charger works like a gas pump and falls under weights and measures law. NIST Handbook 44, Section 3.40 sets the technical rules for EV fueling systems. It became a permanent code effective January 1, 2023. It requires energy to be indicated and recorded in kilowatt-hours. NIST Handbook 130 covers the method of sale.

The Joint Office of Energy and Transportation says this standard has been adopted by all states and territories. States implement it in their own ways, and inspection and registration practices differ. Before opening:

  • Call your state weights and measures office and ask whether chargers must be registered or inspected.
  • Choose hardware with the metrology approvals your state accepts.
  • Display prices clearly in $/kWh plus any idle or session fees; see EV charging pricing models.

Extra Rules for Funded and Public Stations

Public funds bring added conditions. Under NEVI (23 CFR 680), corridor stations must be open 24/7, accept contactless card payment without a membership, keep average annual uptime above 97%, and use chargers certified by an OSHA NRTL. Electricians must also meet qualified-technician rules. State and utility programs add their own terms, so read the program manual before you apply.

A typical sequence looks like this:

  • Pick the site and confirm zoning with the planning office.
  • Request a utility service study and rate options.
  • Have a licensed contractor design the system and pull permits.
  • Install, pass inspections and complete any weights and measures steps.
  • Commission the network, test payments and open.

Our step-by-step guide on how to open an EV charging station covers the business side. For hardware, EVDANCE offers the EV-RHDC30K-L compact DC fast charger (about 20–30 kW, OCPP 1.6J) and the EV-AC03201T dual-gun AC station. Ask us which certifications each model holds for your market.

Frequently Asked Questions

Do I need a license to put a charger at my business for customers?

You need permits and a licensed electrician. If you charge by the kWh, check weights and measures rules too. Free charging may fall outside metering-for-sale rules, but it still needs permits.

How long do permits take?

It varies by city and project size. Utility upgrades are often the longest step, so start that request first.

Is the process the same in every state?

No. Zoning, permit fees, weights and measures practice and utility programs differ. Check local rules for each site.

Related Reading

Key Takeaways

  • There is no single license; you need permits, utility approval and business registration.
  • Selling by the kWh brings weights and measures rules based on NIST Handbook 44.
  • Public funding adds uptime, payment and workforce requirements.
  • Start the utility request early; it is often the longest step.

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

Are Home EV Chargers Safe?

Home EV chargers are safe when certified, installed to code by a licensed electrician and used correctly. Most risks come from uncertified gear and bad wiring.

Read More
0