A project's signage package covers wayfinding, bay identity, price, rules and accessible bays — with every binding value read from the authority's current text.

EVDANCE Insights · EV Charging Guides

For a charging project, signage and bay marking are a documents package, not a paint order. The package lists every element — entrance wayfinding, bay identification, tariff display, rules of use, accessible-bay marking and instructions at the charger — and for each element records two things: the content decision the project makes, and the text that fixes its binding values. Sizes, symbols and wording duties are never copied from another site; they are read from the authority’s current text for the project’s jurisdiction, the funding programme’s rules where they apply, and the operator’s own tariff.

Key Takeaways

  • Signage and bay marking are one package: every element gets a content decision and a named source for its values.
  • No dimension, symbol or wording duty is copied from another site — each is read from the current governing text.
  • Product rating labels and site signs are different surfaces; the specification keeps them separate.
  • No charger is “ADA compliant” as a product — accessibility belongs to the installed site.
EV charging bays in a parking garage
Marked bays in a parking garage: one element of the project’s signage package.

The Package, Element by Element

ElementThe content decisionWhose current text fixes the values
Entrance and wayfinding signsThat charging exists here, and where the bays areThe operator’s content; placement and any sign consent sit with the local authority
Bay identification and ground markingA bay number or name that matches the connector and the platform listing, so a driver starts the right sessionThe operator’s naming scheme, inside the local authority’s marking requirements
Tariff and payment displayThe price and the ways to pay, visible before a session startsThe operator’s tariff; funding programmes can add duties — NEVI-funded corridor stations must take contactless payment with no membership required
Rules-of-use panelWho may charge, stay limits, move-when-finished, idle fees if any, and a help contactThe operator’s terms of use; enforcement wording follows local rules
Accessible-bay marking and signageWhich bays are accessible, their symbols and the marked access route beside themIn the U.S., the ADA Standards and local code, confirmed with the authority having jurisdiction; elsewhere, the local authority’s current text
Instructions at the chargerHow to start, and which connector serves this bay on multi-connector unitsThe operator, using the access methods the charger’s listing states — RFID or app where the model states them

Two Surfaces That Must Not Be Confused

A charger’s own rating label is the manufacturer’s compliance surface: it carries the model’s ratings and required markings, covered in our guide to rating labels and required markings. Site signage is the project’s surface. The specification keeps them separate — site signs do not reproduce the rating label, and no product label does the wayfinding job.

A second boundary matters as much: no charger is certified “ADA compliant” as a product. Accessibility is a property of the installed site — bay, route, mounting and controls as built — judged against the current standards and confirmed with the authority having jurisdiction. A signage package can name the accessible bays and mark them correctly; it cannot confer compliance on the hardware.

Row of EVs charging at commercial wall-mounted charging stations outdoors
A commercial charging row, where wayfinding, bay numbers and tariff display meet the driver.

The Hardware the Package Has to Describe

The package is written against the actual units. On a dual-connector station such as the EV-AC03201T — two Type 2 connectors, up to 43 kW shared, RFID access, OCPP 1.6J — the package must carry the bay-to-connector correspondence in paint, on the cabinet and on the platform listing: one name per connector, repeated identically. Its 7-inch touchscreen is the session’s confirmation surface, a display; it is not a payment terminal, so the tariff display must also tell drivers where payment actually happens. Wallboxes such as the EV-ACT3204PE, a 22 kW three-phase Type 2 unit with RFID and app access, put the instructions at the unit instead. Multi-site operators can standardise the package with our commercial EV charging team or via contact us.

Frequently Asked Questions

What size do bay markings and signs have to be?

This article gives no figure, deliberately. Dimensions, symbols and placement are set by the current text that governs your jurisdiction — read them there, confirm them with the authority, and only then put sizes into the package.

Can we copy the signage package from our last project?

The structure, yes; the values, no. Rules, programme duties and tariffs change, and a new jurisdiction brings a new authority. Reuse the element list; re-read every value.

Who writes the rules-of-use panel?

The operator, inside local requirements. Stay limits, idle fees and enforcement wording are the operator’s terms; where a funding programme sets display or payment duties, its current text governs those lines.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0