Evdance
Select Language
English (US)
Deutsch
Français
Nederlands
Polski
Русский
한국어
ภาษาไทย
Tiếng Việt
Español
Português
العربية

EV-ACT3204E for Office Buildings: Billing Tenants for Charging

Row of EVs charging at commercial wall-mount charging stations in an office parking lot
How office landlords can bill tenants fairly for EV charging: metering options, RFID per tenant, tariffs and the paperwork, using a 22 kW wallbox.

EVDANCE Insights · EV Charging Guides

Office landlords can bill tenants for EV charging by giving each tenant’s drivers their own RFID cards, recording energy per session, and charging an agreed rate per kWh, either through an OCPP management platform or a simple monthly report. A 22 kW three-phase wallbox such as the EV-ACT3204PE supports RFID and app authorization, which makes per-tenant tracking straightforward. Agree the billing method in the lease before installing.

Key Takeaways

  • Per-kWh billing with RFID cards is the fairest model.
  • Check local rules on reselling electricity and metering.
  • Group RFID cards by tenant for automatic reporting.
  • Agree billing in the lease before installation.
Row of EVs charging at commercial wall-mount charging stations in an office parking lot
Shared office car parks need a fair way to split charging costs between tenants.

Choose a Billing Model

ModelHow it worksBest for
Per kWhTenant pays for energy recorded per session at an agreed rateFairest; most common
Per session or per hourFlat fee per session or time connectedSimple; encourages moving cars
Included in service chargeCost shared across all tenantsSmall buildings with few EVs
Allocated baysEach tenant leases specific chargersTenants with fleets

Whatever you choose, keep it transparent. Tenants should be able to see their sessions and the rate applied.

Metering and Records

The charger’s session records, read through its app or an OCPP platform, show energy per card. Some jurisdictions require certified metering when energy is resold, and rules on reselling electricity vary, so check local requirements with an adviser before setting a per-kWh price. A building sub-meter on the charging circuit helps you reconcile charger totals with the utility bill. Our article on smart charger meters explains measurement, and OCPP explained covers back-office platforms.

RFID Cards Per Tenant

  • Issue cards to each tenant’s drivers and record which tenant each card belongs to.
  • Deactivate cards promptly when employees leave.
  • Use separate card groups so monthly reports split by tenant automatically.
  • Keep spare cards and a simple request process.

Read RFID user management for shared chargers for setup details.

Setting a Fair Rate

Start from your electricity cost per kWh, then add a margin for hardware, installation, maintenance and software subscriptions, if any. Peak demand charges can matter for buildings with many chargers, so consider load management to keep peaks down. Review the rate yearly against actual costs.

Power and Speed

At 32 A on a 400 V three-phase supply, the EV-ACT3204PE can deliver up to 22 kW. Many cars accept only 11 kW on AC, but office parking lasts all day, so even 7 or 11 kW fully covers most commutes. A 22 kW unit gives headroom for cars that accept more. The EV-ACT3204PE is hard-wired, uses a tethered Type 2 cable, supports RFID and app control, and has an IP65/IP66 enclosure with CE and RoHS marks. See EVDANCE commercial charging for multi-bay projects.

Frequently Asked Questions

How do landlords charge tenants for EV charging?

Usually per kWh using RFID cards and session records, or through a flat fee or service charge.

Do I need a certified meter to bill tenants?

In some places, yes, when you resell electricity. Check local rules before setting prices.

Can each tenant see its own usage?

Yes, if cards are grouped by tenant and you share monthly reports or platform access.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0