Depot chargers should be bought against measured use: returns, dwell and shift energy from your own records set the port count and the power per port.

EVDANCE Insights · EV Charging Guides

Buy for utilisation: measure the depot’s own duty first, then let the measurements set the purchase. Utilisation — the share of a port’s time and capacity that vehicles actually use — is counted from your own session records; no outside benchmark can tell you your number. When vehicles return, how long they dwell, how much energy each needs before its next shift: those three records decide the port count and the power per port.

Key Takeaways

  • Measure the depot’s own duty — returns, dwell, shift energy per class — before any purchase.
  • Concurrency sets the port count; the dwell window sets the power per port.
  • Buy in phases; let session records argue for expansion.
  • EVDANCE serves light-duty depots and states its boundary: no bus, heavy-duty or high-power DC product.
EVDANCE EV-AC03201T dual-connector station for depot and fleet AC charging
A depot buys against its own duty record.

Step 1: Measure the Duty You Already Run

The evidence already exists — dispatch logs, telematics, fuel records from the vehicles being replaced. Pull three numbers per vehicle class: return-to-base time, dwell window before the next shift, energy a shift consumes. Classes matter more than totals: vans returning together at 18:00 and leaving at 06:00 have a twelve-hour window; pool cars come and go all day. Buy against the classes, not the average day.

Step 2: Ports From Concurrency, Power From the Window

Evidence from your recordsThe decision it setsHow the decision is made
How many vehicles are plugged in at the busiest momentPort countConcurrency, not fleet size: vehicles returning in waves share ports across the night
Dwell window and the energy the next shift needsPower per portShift energy divided by the window gives the rate the port must sustain — inside the DOT Level 2 band of 7–19 kW for most overnight duty
A class with a short turnaroundWhether any DC is needed at allOnly the class whose window cannot be met at AC rates justifies a DC point
Vehicles arriving in phases over the replacement programmeInstall phasingInfrastructure for the full plan, ports per phase; expansion argued from the first phase’s records

The sizing arithmetic — currents, the NEC rule sizing breakers at 125% of a continuous load, supply capacity — is worked in our guide to sizing depot AC chargers for vans and light commercial vehicles. This article is the step before it. A port used hard for six hours of a twelve-hour window beats a faster port used for two: utilisation, not rating, is what the depot pays to create.

Step 3: Buy in Phases, and Let the Records Argue

Fit the first phase, run it, and read its records before committing the rest. Session data — OCPP-based records make utilisation visible at all, as our OCPP explainer sets out — shows where vehicles queue and where ports idle. Queues justify the next phase; idle ports argue for moving hardware between classes instead. Access control belongs in the same purchase: any authorised driver must be able to start any port — a stated access method (RFID or app, as listed) plus session records per vehicle. The employer’s wider policy sits in our workplace charging program guide; the depot purchase is narrower.

EVDANCE EV-RHDC30K-L compact DC charger
Compact DC earns its place only where a turnaround window defeats AC.

Hardware for Light-Duty Depots — and the Honest Boundary

For depot AC, the EV-AC03201T station serves two bays from one unit — two Type 2 connectors sharing up to 43 kW (22 kW per connector), OCPP 1.6J, RFID, IP54 — and the EV-ACT3204PE 22 kW three-phase wallbox covers single bays (RFID and app access). For depot AC, the EV-AC03201T station serves two bays from one unit — two Type 2 connectors sharing up to 43 kW (22 kW per connector), OCPP 1.6J, RFID, IP54 — and the EV-ACT3204PE 22 kW three-phase wallbox covers single bays (RFID and app access). Where a light-duty class turns around fast, the EV-RHDC30K-L compact DC charger delivers 22 kW — a top-up class, below the DOT’s 50–350 kW DC fast band. The boundary, plainly: EVDANCE offers no bus, pantograph or heavy-duty product and no high-power DC, so this method serves car, van and light-commercial depots. EVDANCE was founded in 2011, exports to 30+ countries and carries a 3-year standard warranty. Enquiries start through our commercial charging team or contact us.

Frequently Asked Questions

What utilisation rate should a depot aim for?

There is no published benchmark to aim at; a vendor quoting one is inventing it. The right level is the depot’s own: ports busy enough that vehicles never wait, and none bought so far ahead of demand that it idles for years. Your records show both failures.

Should a depot choose AC or DC charging?

The dwell window decides. Overnight return-to-base duty is met by AC inside the DOT Level 2 band for most light-duty classes; DC earns its cost only where a class’s turnaround is too short for AC. Mixed depots usually need mostly AC, plus a few DC points at most.

When should a depot add more ports?

When the records show concurrent demand going unmet — vehicles waiting, or a class regularly starting a shift short. Fit infrastructure ahead of the vehicle programme; let measured queues, not forecasts, release the port purchases.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0