Evdance
Select Language
English (US)
Deutsch
Français
Nederlands
Polski
Русский
한국어
ภาษาไทย
Tiếng Việt
Español
Português
العربية

Remote Surveys for EV Charger Installs: Photos, Videos and Checklists

Close-up of a hand plugging an EVDANCE portable EV charger connector into a car
A remote survey replaces the first site visit with a structured pack of photos, video and measurements the customer collects — and it has clear limits.

EVDANCE Insights · EV Charging Guides

A remote survey replaces the installer’s first visit with a structured evidence pack the customer collects: labelled photos of the consumer unit and supply, a walk-through video of the cable route, the charger position and the car it will serve. For a straightforward job, that pack fixes the scope and supports a firm quote. It decides nothing that has to be measured — earthing, load and hidden runs are verified on site.

Key Takeaways

  • A remote survey is one structured evidence pack: board, supply, route video, charger position, car.
  • Each shot settles a scoping question; measurements — earthing, load, hidden runs — stay open until the visit.
  • Quote standard jobs from the pack; visit first for old boards, long routes and commercial sites.
  • Never ask a customer to open a consumer unit for a photo; covers come off only for your electrician.
Close-up of a hand plugging an EVDANCE portable EV charger into a car
The customer’s phone does the travelling: the pack shows the car, the parking spot and the daily cable run.

The Evidence Pack: What to Ask For

Send one checklist, not a stream of messages. Each item settles a question that otherwise becomes a surprise on install day.

Shot or itemWhat it decidesWhat it cannot decide
Consumer unit, front-on, plus a close-up of the breaker labelsWhether a spare way is visible and what feeds the boardThe board’s condition inside or its capacity under load — photos of the closed unit only; opening it is your job, never the customer’s
Meter and main fuse area, with the rating plate legibleThe supply size the quote is planned againstWhether the network operator allows the added load — that answer is theirs
A slow video walk from the board to the charger positionRoute length, what the run passes, where drilling or trenching fallsWhat is hidden inside walls or under floors along that route
The charger position and the parking spot, shot wideMounting surface, weather exposure, and whether the cable reaches the car’s port — the question where to install a home charger works throughWall construction behind the surface, and fixings strength
The car, its charge port side, and its normal parking positionCable length class and connector family for the quoteThe car’s acceptance rate — that comes from its documentation, not a photo

What a Photo Cannot Decide

The pack plans and prices; it does not verify. These questions stay open until your electrician is on site:

  • Earthing quality. An earthing arrangement can be photographed; whether it measures correctly cannot. It is tested on site, with instruments.
  • True spare capacity. A free way is not automatically headroom. The load picture is confirmed on site against the supply and the home’s other loads, as the factors that drive installation cost set out.
  • Hidden route problems. Joists, insulation and other services hide from a camera. Price the route the video shows, and say what would change the price.
  • Signal at the charger. Phone bars are a report, not a test; whether a smart unit holds its connection at that spot is proven at commissioning.

Sorting Jobs: Quote From the Pack, or Visit First

  • Quote remotely when the pack is complete and the job matches what a standard installation includes: modern board, spare way, short open route.
  • Visit first when the board is old or unlabelled, the route is long, trenched or through finished rooms, or the site is commercial.

Either way, name the assumptions in the quote — a quote that lists them survives install day.

Two electric vehicles charging from a wall-mounted home charger
A complete pack shows the finished picture the quote promises.

Fix the Charger Rating From Evidence, Not Hope

The survey output is a rating decision. Charging is a continuous load under the U.S. National Electrical Code, so the circuit is sized at 125% of the charger’s draw: 32 A on a 40 A breaker, 48 A on a 60 A breaker. Where the pack shows a healthy supply, the EV-ACT5006T 48A wall charger is a fair specification; where the supply is tighter, the EV-ACS3210T portable, adjustable from 10 A to 32 A in six steps, lets the setting match the site. Installers building a repeatable remote-survey workflow can open a supply conversation through the distributor program or the contact page.

Frequently Asked Questions

Can every installation be surveyed remotely?

No. Remote evidence suits standard homes with a modern board and a visible route. Old or unlabelled boards, long or hidden runs, unusual supplies and commercial sites still earn a visit first — the pack sorts them out early.

What if the customer’s photos are unclear?

Send the checklist back with the failed items marked, and ask for those shots again in daylight, front-on, labels in focus. Do not quote around a blur: an unreadable label is an open question, and open questions belong in the quote as stated assumptions.

Does a remote survey replace the inspection or the on-site tests?

Never. The survey is pre-quote evidence. Testing, certification and any local inspection happen on the finished installation, in person.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0