A bulk wallbox order should include more than the chargers. Plan spare units, extra RFID cards, mounting brackets or pedestals, cable holsters, and the documents installers need, so a project never stalls for a small part. For the EV-ACT3204E, decide early between tethered Type 2 cable and socket versions, and agree spares and lead times with EVDANCE before production starts.
Key Takeaways
- Order spares, cards, brackets and documents with the chargers.
- Decide tethered vs socket and market version early.
- Agree lead times and inspection in writing.
- Track serial numbers by site from day one.

The Bulk Order Checklist
| Item | Typical planning approach | Why |
|---|---|---|
| Chargers by version | Split by tethered cable vs socket | Different sites prefer different versions |
| Spare chargers | A small percentage of the order | Quick swaps for damaged or faulty units |
| RFID cards | Several per charger, plus spares | New users and lost cards |
| Brackets and pedestals | Per mounting location | Not every bay has a wall |
| Holsters and cable hooks | One per tethered unit | Protects connectors |
| Documents | Manuals, conformity declarations, test reports | Installers and inspectors need them |
| Labels | Site IDs or asset tags | Maintenance and OCPP records |
The right quantities depend on your project. Share site plans with the supplier so they can suggest a sensible spares ratio.
Version Decisions to Make Early
- Tethered or socket: tethered suits private fleets; socket suits public or mixed vehicles where drivers bring their own cable. Read tethered vs socketed wallboxes.
- Branding: standard or private label, which affects packaging and lead time.
- Back-office: app only, or OCPP platform. Configure before shipping if possible.
- Market version: confirm the protective functions and markings needed in each destination country.
Lead Times and Inspection
Agree production lead time, inspection and shipping method in writing. A pre-shipment inspection checks quantities, labels, packaging and a sample of functional tests. Our guides on pre-shipment inspection and MOQ explained help with planning, and the spare parts and RMA process covers after-sales.
Delivery and Storage on Site
Large orders often arrive before sites are ready. Store cartons dry and off the floor, keep chargers in their packaging until installation, and record serial numbers against sites as units go out. This saves time on warranty claims later. A simple spreadsheet listing serial number, site, bay, installation date and installer is enough for most projects, and it becomes the starting point for maintenance records and OCPP asset IDs once the chargers are live.
About the EV-ACT3204PE
The EV-ACT3204PE is a hard-wired 22 kW three-phase wallbox at 32 A and 380 to 400 V, with a tethered Type 2 cable, RFID and app control, an IP66 enclosure and CE and RoHS marks. EVDANCE builds in its own Shenzhen factory, ships FOB or DDP, and supports private label from 100 units with a 3-year standard warranty.
Frequently Asked Questions
How many spare chargers should a bulk order include?
A small percentage is common, but it depends on site count and how quickly replacements can arrive. Agree it with your supplier.
Should RFID cards ship with the chargers?
Yes. Ordering extra cards with the chargers avoids delays when new users start.
Can chargers be configured before shipping?
Often, yes. Settings such as OCPP server details can be preloaded if agreed in advance.
Related Reading
- Tethered vs Socketed Wallbox Chargers: Which Should You Install?
- Pre-Shipment Inspection and AQL Sampling for EV Charger Orders
- EV Charger MOQ Explained: What Sets Minimum Order Quantities
- EV Charger Spare Parts and RMA Process for Distributors