EV Chargers for Office Buildings: Landlord vs Tenant Responsibilities

Row of EVs charging at commercial wall-mount charging stations in an office parking lot
Who pays for office EV chargers — hardware, supply upgrade, electricity, repairs — is set by the lease, item by item. The split to settle before installing.

EVDANCE Insights · EV Charging Guides

There is no default split. Who pays for the chargers, the electrical upgrade, the electricity and the repairs is whatever the lease and service-charge documents say — and most leases were written before charging existed. Settle each item in writing before anything is installed.

Key Takeaways

  • No default split exists: responsibility for office charging is set by the lease documents, item by item.
  • The supply upgrade matters most — it stays with the building, so price and assign it first.
  • Electricity recovery needs a per-user record; access control is a paperwork decision too.
  • Settle ownership, maintenance and reinstatement in writing before installation, with your own advisers.
Row of EVs charging at commercial wall-mount charging stations in an office parking lot
Office charging sits on the building’s supply and its documents.

The Responsibility Table: Settle Each Line in the Lease

Each item can sit with a different party. Use the table as the agenda; the answers belong in the lease or a written side agreement, not an email thread.

ItemThe landlord-side questionThe tenant-side questionWhere it gets written down
Electrical capacity and any supply upgradeDoes the supply carry the load, and is an upgrade a building asset the landlord funds?Will the tenant’s fit-out pay for capacity it leaves behind?Works schedule + electrician’s assessment
Chargers: purchase and ownershipDoes the landlord buy and keep the units?Does the tenant buy units it owns — and may it remove them?Lease amendment naming the owner
Installation and approvalsWhich contractors may work on the building’s system, under whose insurance?Who contracts the installer, and who holds the records?Fit-out or licence-to-alter documents
Electricity cost and recoveryRecovered via the service charge, a submeter, or not at all?What will drivers be charged, and on what record?Service-charge schedule or charging agreement
Access and day-to-day runningWho administers users — building management or the tenant?Can visitors and other tenants’ staff be admitted?Building rules + charger administration
Maintenance, faults and damageWho holds the service arrangement for shared units?Who reports a fault, and who pays for damage?Service agreement and lease repair clauses
End of leaseMust the bays be reinstated, at whose cost?May the tenant remove its chargers? What happens to the wiring?Reinstatement clause, agreed first

Why the Supply Line Is the Hardest One

Chargers are cheap next to capacity. EV charging is a continuous load under the National Electrical Code, so breakers are sized at 125% of the charger current — a 40 A charger needs a 50 A breaker, a 48 A charger a 60 A breaker. A row of them can still exceed an older building’s spare capacity; a licensed electrician’s assessment settles what it can carry. For scale only, U.S. DOE figures put public Level 2 at about $3,500 of equipment plus $2,500 of installation per connector, before any supply upgrade — and the upgrade matters most, because it stays with the building whoever pays for it. The wider programme questions sit in our guide to planning a workplace charging program.

Recovering the Electricity Cost Without Inventing a Rule

Three recovery shapes recur: energy in the service charge, energy measured per user and billed back, or charging offered free. Which are open depends on the building’s metering and local rules on reselling electricity; confirm them for your building rather than copying another site’s arrangement. What does not vary is the record: per-user recovery needs session records tied to a driver — the RFID explainer and shared-parking guide in Related Reading cover both.

Workplace EV charging bays in an office car park
Shared bays, shared documents.

Hardware for Shared Office Parking

For a shared car park, the EV-AC03201T dual-connector AC station serves two bays from one unit — two Type 2 connectors sharing up to 43 kW (22 kW per connector), OCPP 1.6J, RFID access, IP54, recording users per session. For single bays, the EV-ACT3204PE 22 kW three-phase wallbox (tethered Type 2 cable, RFID and app, IP66, CE) gives the same per-user record. Neither unit is a payment terminal: if drivers are billed, billing runs on the operator platform the building appoints. EVDANCE is a Shenzhen manufacturer founded in 2011 with a 3-year standard warranty. Projects start through our commercial charging team or contact us.

Frequently Asked Questions

Who normally pays for office EV chargers — the landlord or the tenant?

There is no normal answer that survives contact with a real lease. Buildings split the lines differently: capacity and wiring often follow the building; hardware and running costs follow whoever asked for the charging. What protects both sides is the split written down.

Can a tenant install its own chargers in a landlord’s car park?

Only with the landlord’s written consent, on the building’s terms — the work touches the supply, the insurance and other tenants’ parking. A tenant who installs first usually ends up removing the units.

What happens to the chargers when the tenant leaves?

Whatever the reinstatement clause says. Agree it at the start: whether tenant-owned units are removed, whether landlord-owned units stay, and who pays. It is the cheapest line to settle early, the most expensive at exit.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0