Fleet Depot Package: AC Wallboxes, DC Charging and Portables

A fleet depot package divides the work: AC wallboxes for the overnight row, one compact DC unit for the turnaround lane, and a portable as the spare. Here is the composition.

EVDANCE Insights · EV Charging Guides

A fleet depot package is three layers, one for each job the depot has. AC wallboxes carry the overnight row, where vehicles dwell for hours and the work is scheduling, not speed. One compact DC unit works the turnaround lane — the missed charge and the midday return. A three-phase portable rides behind both as the spare. This article sets out that composition and its load picture; sizing the fixed row itself is worked through in our fleet depot sizing guide.

Key Takeaways

  • Compose the depot by job: wallboxes for the overnight row, one compact DC unit for turnaround, a portable as the spare.
  • Overnight charging rewards coverage and attribution, not power — one post at the vehicle’s own bay.
  • State the load picture as labelled ceiling arithmetic (example: 154 kW); capacity is the electrician’s and utility’s call.
  • No cross-unit load management is listed for these products — if the plan needs it, confirm it in writing first.
EVDANCE EV-ACT3204PE 22 kW three-phase wallbox
The EV-ACT3204E: the overnight layer, one wallbox at the vehicle’s own bay.

The Package by Job

LayerThe job it doesIn the packageNotes, as listed
Overnight rowEvery vehicle, every nightEV-ACT3204PE wallboxes; the EV-ACT5006T for North American depots22 kW three-phase, RFID and app on the ACT3204PE — sessions tie to a vehicle or driver; the ACT5006T is the 48 A NACS point
Turnaround laneThe missed charge, the extra trip, the midday returnOne EV-RHDC30K-L22 kW DC class, single connector, OCPP 1.6J; bypasses the onboard charger; connector variant confirmed in writing
Spare and flexA bay down, an overflow night, a temporary siteAn EV-ACS3205PE portable22 kW three-phase from a CEE 32A socket — needs a sound socket wherever deployed

Why the Base Layer Is Wallboxes

Overnight, time does the work that power does at a fast charger. A van parked for ten hours needs its energy by morning, attributed to the right vehicle — not quickly, and not via a shift-change queue for a shared point. A wallbox at each bay gives exactly that: the vehicle plugs in where it parks, the ACT3204E’s RFID ties the session to a card, and the row scales by bays, not charger power. Some depots build this layer on dual-connector stations instead — fewer, shared points with platform records — a legitimate composition of its own. This package is the wallbox one.

The Load Picture the Package Creates

The electrical question fits in one labelled example. A depot with six ACT3204PE wallboxes and one RHDC30K-L has a combined nameplate ceiling of 6 × 22 kW + 22 kW = 154 kW. That is arithmetic on ceilings, not a prediction — real draw sits below it, staggered by the rota as vehicles arrive and finish at different times. Its job is to open the capacity conversation: the electrician’s and utility’s written assessment decides what the supply can carry.

Two discipline points keep the picture honest. First, no product here is listed with cross-unit load management, so if the plan depends on chargers coordinating, that capability is a written confirmation before the order. Second, the portable draws only when plugged into a socket, on whatever circuit that socket belongs to — its deployment belongs in the depot’s own plan. Session records split the same way: RFID and app records on the wallboxes, OCPP 1.6J on the DC unit — see our OCPP explainer.

EVDANCE EV-RHDC30K-L compact DC charger
The EV-RHDC30K-L: the turnaround lane — 22 kW of DC for the vehicle that cannot wait for the row.

The Spare Is a Plan, Not a Purchase

  • A named home. One known place, signed out against the bay it covers — a spare nobody can find at midnight is not a spare.
  • A socket list. Its usable CEE sockets are listed and checked in advance, overflow parking included.
  • A deployment rule. Who moves it, to which bay first, is decided in advance — not improvised during an outage.

The Package, Listed

EVDANCE supplies the composition as one range — the EV-ACT3204E and EV-ACT5006T wallboxes, the EV-RHDC30K-L, and the EV-ACS3205PE — through its commercial charging range, with a 3-year standard warranty. Fleets can take the hardware under their own livery via the private-label program, from 100 units.

Frequently Asked Questions

Why not build the depot on dual-connector stations instead?

You can — a different composition, not a wrong one. Stations suit depots preferring fewer shared points; wallboxes suit one-vehicle-per-bay yards wanting sessions tied to bay and driver. Choose by how the yard parks.

Is the DC unit a fast charger for route stops?

No. At 22 kW it sits far below the public DC fast charging band of roughly 50–350 kW; it is a turnaround lane for the depot’s own vehicles. Route stops are public DC’s job.

Does one platform see the whole package?

Not as a listed fact. The DC unit lists OCPP 1.6J; the wallbox lists RFID and app control. A single back office across both layers is a written confirmation before the order, never an assumption.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0