EV-ACT3204E Load Planning: Two Wallboxes on One Supply

Two 22 kW wallboxes on one supply draw up to 64 A per phase together. Size the supply for both, or plan the usage — the load maths and the two routes.

EVDANCE Insights · EV Charging Guides

Yes, two wallboxes can run on one supply — the planning question is the combined draw. Two EV-ACT3204E units at full rate draw 32 A per phase each, so together they ask the supply for 64 A per phase, about 44 kW. Either the supply is sized for that combined load, or the usage is planned so the two never peak at once.

Key Takeaways

  • Two EV-ACT3204E wallboxes at full rate draw 64 A per phase combined — about 44 kW, sustained for hours.
  • Route one is capacity: a load calculation, a dedicated circuit per unit, a supply upgrade if the numbers require one.
  • Route two is usage: staggered windows and rotation, with RFID access keeping it enforceable.
  • Load sharing is not stated in this model’s listing — if your plan needs it, confirm it in writing first.
EV-ACT3204E 22 kW three-phase wallbox
The EV-ACT3204PE: pair planning starts from its stated input — 32 A per phase.

The Combined Load, in Numbers

Everything here is arithmetic on the unit’s stated input — 32 A per phase, about 22 kW. Two units on the same supply add line by line:

ArrangementDraw per phaseCombined power
One wallbox charging32 AAbout 22 kW
Two wallboxes charging at full rate64 AAbout 44 kW

Two things drive the plan. First, charging is a continuous load: those amps flow for hours, so supply, protection and cabling are planned around the sustained figure, not a brief peak. Second, the worst case is both cars drawing at once — on a shared site, exactly what happens on busy evenings. Plan for the second row, or arrange that it never occurs.

Route One: Size the Supply for Both

The straightforward route is capacity. Your installer runs a load calculation for the property — our guide to load calculation basics for adding EV chargers to a building walks through it — and checks whether the supply and board can carry 64 A per phase of charging on top of everything else the building uses.

  • Each wallbox gets its own dedicated circuit, designed for 32 A per phase continuous; the sizing of each belongs to the installer, as with a single unit.
  • The supply is the ceiling. If the calculation says the supply cannot carry the pair plus the building’s other loads, the honest answers are a supply upgrade or Route Two — not a smaller breaker and a hope.

Route Two: Plan the Usage, Not Just the Wiring

If the supply cannot carry both at full rate, the second route is to make sure it never has to. It works because most pairs of cars do not need 22 kW at the same moment:

  • Stagger the windows. One unit serves the early-evening arrivals, the other the overnight cars. A car parked for ten hours rarely needs its charge in the first two; when both arrive empty, they take turns rather than share.
  • Control who starts a session. RFID and app access means a session starts with a card, not by anyone plugging in — on a shared site that keeps the plan enforceable (see our explainer on RFID and user management for shared chargers).

One caution. Automatic load sharing — two chargers dividing a capped supply and rebalancing as cars finish — is a real technique, explained in our guides to dynamic load balancing and whether load balancing increases charging speed. But this model’s listing does not state such a function. Do not design a site around a feature the spec sheet does not claim: if automatic sharing matters to your plan, get it confirmed in writing before the supply is designed around it.

Two electric cars charging at wall-mounted chargers
Two cars charging side by side is the normal case on a shared site — the plan has to assume both draw at once, or prevent it.

The Wallboxes Behind the Plan

The EV-ACT3204PE is a 22 kW wallbox for three-phase supplies: 32 A per phase at 380–400 V, hardwired, tethered Type 2 cable, RFID and app control, IP66 housing, CE mark. A pair suits a two-bay property, a small workplace or a landlord’s two spaces — same unit, spares and card system on both bays. EVDANCE is a Shenzhen manufacturer founded in 2011; the model carries its 3-year standard warranty.

Frequently Asked Questions

Can both wallboxes run at full speed at the same time?

Only if the supply was sized for it — 64 A per phase of continuous load on top of the building’s other demand, which is the installer’s load calculation to make. Otherwise plan the usage: stagger or rotate.

Will two ACT3204E units automatically share a limited supply?

Not stated — treat it as a written-confirmation item with EVDANCE. Until confirmed, the plans are a supply sized for both, or a usage plan keeping the combined draw inside the supply.

Does each wallbox still need its own circuit?

Plan on it: each unit is a 32 A per phase continuous load, and installers design a dedicated circuit per wallbox, sized and protected for that unit.

Related Reading

Sources & Standards

EVDANCE · EV Charger Manufacturer

Looking for a reliable EV charger supplier?

Portable EV chargers and wallbox home chargers for distributors, installers and brands. Tell us your market and we will reply with a quote.

  • OEM / ODM from 50 units
  • 3-year standard warranty
  • FOB / DDP shipping worldwide
Share the Post:

Related Posts

0